The City of Cincinnati is soliciting bids for the design‑build demolition, excavation, and reconstruction of the existing retaining wall on Sycamore Street (PID 122597). The contract covers removal of the existing wall and associated structures, site grading, concrete surface preparation, installation of a prefabricated modular retaining wall system, traffic control, signage, and landscaping. Work must commence within five days of notice and is slated to start mid‑January 2027, with a 60‑day construction window. The project requires ODOT pre‑qualification, a 5 % SBE participation goal, performance and payment bonds (10 % of bid), and compliance with Davis‑Bacon prevailing‑wage rates, Buy‑America, and drug‑free safety program standards.
• Demolition of existing retaining wall, curb, pavement, and related infrastructure.
• Excavation (~513 cu yd) and installation of a 358 sf prefabricated modular retaining wall.
• Concrete work (epoxy‑urethane sealing, concrete walk, curb ramps, detectable warnings).
• Traffic management, signage, striping, and site landscaping (seeding, mulching).
• Mandatory ODOT SBE utilization plan and bonding/insurance requirements.