The Ohio Department of Natural Resources is soliciting a qualified contractor to perform a full rehabilitation of the Adams Lake Dam, including removal of the existing principal spillway, construction of a new concrete control tower, and installation of a labyrinth spillway through the embankment. The project is a design‑build, general‑contract effort with a total estimated value of approximately $13.78 million, subject to alternates for a temporary batch plant and an integrated tower design. Bids must be submitted electronically via BidExpress, and the contractor must meet prevailing‑wage, EDGE participation (minimum 5 %), domestic‑steel, and executive‑order compliance requirements. The work must be completed within 540 days from the Notice to Proceed.
• Remove existing principal spillway and construct new labyrinth spillway and concrete control tower.
• Provide optional temporary batch plant (Alternate 1) and an integrated tower design (Alternate 2) with associated quantity adjustments.
• Comply with prevailing‑wage rules, 5 % EDGE participation, domestic‑steel mandates, and relevant Executive Orders.
• Submit electronic bids by 2 PM EDT on September 9 2026 after attending the virtual pre‑bid meeting on August 14 2026.
• Base contract amount is roughly $13.78 million; the contractor will manage all sub‑contracts, staging, utilities, and site‑protection measures.