The University of California, Los Angeles is seeking a qualified contractor to remodel and upgrade the 13,000‑square‑foot playground at the Rehabilitation Center. The scope includes demolition of existing structures, grading, utility relocation, installation of new playground equipment (provided by the Intervention Program), resilient flooring, shade structures, ADA‑compliant ramps, concrete paving, benches, play sand, and landscaping, with fifteen optional alternates covering irrigation, fencing, water supply, CMU walls, footings, graphics, and material storage. The project is a sealed‑bid, lump‑sum contract with an estimated construction cost of $1.467 million. Bidders must hold California B and C‑27 licenses, comply with UC Fair Wage and prevailing‑wage requirements, and attend at least one mandatory pre‑bid Zoom conference and one site walk.
• Core work: demolition, grading, utility relocation, concrete work, and installation of playground equipment and ADA‑compliant features.
• Optional alternates: up to 15 add‑ons (e.g., irrigation, decorative fencing, additional footings, graphics, storage).
• Requirements: California B‑License, C‑27 License, registration with the Department of Industrial Relations, and adherence to prevailing‑wage rules.