The US Army is seeking sources for retrofit and modernization services for fielded Joint Assault Bridge (JAB) systems. The requirement includes the integration of critical Engineering Change Proposals (ECPs) to address obsolescence issues and improve crew survivability. The retrofits include the integration of the Mission Ready Tablet (MRT), installation of Add-on-Armor (AoA) to the Bridge Launch Mechanism (BLM), and installation of Hydraulic Power Unit (HPU) Weld Studs and a Hydraulic Parking Brake. The contractor will be required to provide highly skilled Field Service Representatives (FSRs) capable of traveling to unit motor pools to perform complex hydraulic integration, heavy armor installation, and system validation.
• The contractor must execute these retrofits in austere or standard motor pool environments with fixed facility cranes or overhead lift capability.
• The contractor must coordinate directly with military units to ensure minimal disruption to deployment and training cycles.
• The contractor must have the ability to obtain a SECRET facility clearance and have personnel with SECRET clearances.
• The contractor must have experience conducting complex system upgrades in active military motor pools.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.