The City of San Diego is seeking qualified contractors to replace and upgrade the traffic‑signal system at the intersection of Rosecrans Street and Byron Street (Shelter Island). The scope includes demolition of existing signal poles, foundations, mast arms, luminaires, controller cabinets, conduit, detector loops, signage, striping, curb ramps and pavement resurfacing, followed by installation of new poles, foundations, mast arms, LED signal heads, a fully‑loaded controller cabinet, conduit, detector loops, pedestrian accessories, signage, striping, and surface restoration. The contract is a lump‑sum design‑bid‑build award valued at approximately $856 k, with a performance period of roughly 216 working days (about 10‑12 months). The solicitation is restricted to City‑certified SLBE/ELBE firms, requires a 10 % bid bond, and obligates compliance with prevailing‑wage and CARB off‑road diesel fleet regulations. All required certifications, debarment statements, and insurance documents must be uploaded to PlanetBids by the bid deadline.
• Remove and replace all traffic‑signal hardware, foundations, conduit, and related civil works.
• Provide full electrical installation (LED heads, controller cabinet, detector loops, conduit, power distribution).
• Complete roadway resurfacing, curb‑ramp reconstruction, striping, and ADA‑compliant pedestrian facilities.
• Mandatory participation of SLBE/ELBE firms; bid bond 10 % of total bid; performance & payment bonds required post‑award.
• Contract duration ~216 working days; project funded by City of San Diego with a cooperative agreement with the State of California.