The Town of Windsor is seeking bids for the Kern Ditch Culvert Extension project, which includes the extension of the Kern Ditch Culvert, construction of a concrete basin, sidewalk, access ramps, and drainage pan at the intersection of Chimney Park Drive and Main Street. The project requires the work within the ditch to be completed by April 1, 2026, and the final completion date is May 15, 2026. The bid submission deadline is December 16, 2025, at 1:00 PM PST. The project involves construction of a culvert extension, concrete basin, sidewalk, access ramps, and drainage pan, and requires compliance with the Town of Windsor's design criteria and construction specifications. The contractor will be responsible for all means, methods, techniques, sequences, or construction procedures required for performing and furnishing the work.
• The project includes the extension of the Kern Ditch Culvert and construction of a concrete basin, sidewalk, access ramps, and drainage pan.
• The work within the ditch must be completed by April 1, 2026, and the final completion date is May 15, 2026.
• The bid submission deadline is December 16, 2025, at 1:00 PM PST.
• The project requires compliance with the Town of Windsor's design criteria and construction specifications.
• The contractor will be responsible for all means, methods, techniques, sequences, or construction procedures required for performing and furnishing the work.