Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›City of Colusa 2026 Will S. Green Avenue Pump Station…

City of Colusa·California

City of Colusa 2026 Will S. Green Avenue Pump Station Project

Closes 8/27/2026$5M – $6MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Colusa is soliciting sealed bids for the design‑build construction of a new wastewater pump station on Will S. Green Avenue. The scope includes site grading, installation of two wet wells, four sub‑mersible pumps, associated force mains, a control building, backup diesel generator, electrical controls, a recycled‑water booster pump, fencing, and related civil‑works such as manholes, storm‑drain inlets, and site elevation above the floodplain. The contractor must provide all labor, materials, equipment, permits, temporary facilities, traffic control, and safety plans, and will be responsible for commissioning, testing, and a two‑year warranty. Estimated construction cost is $5.5 million, with bid submission due August 27, 2026. • Construct new wastewater pump station (wet wells, pumps, force mains, control building). • Perform site grading and raise elevation 2‑3 ft above floodplain. • Install backup diesel generator, electrical controls, and fiber optic services. • Provide recycled‑water booster pump station and associated piping. • Include civil works: manholes, storm‑drain inlets, fencing, motorized gates. • Deliver all permits, temporary facilities, safety and traffic‑control plans. • Complete testing, commissioning, and provide a two‑year warranty.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jimena Gamero(Bid Contact)

[email protected]

(650) 440-3429

Key dates

Opened
7/23/2026
Questions due
8/14/2026
Pre-bid meeting
8/5/2026
Closes
8/27/2026
Duration
730 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
SRF Project No. C-06-8613-110

Budget estimate

$5,000,000 – $6,000,000

The bid documents state an estimated construction cost of $5,500,000. Assuming a typical contractor margin of 10‑15 % for a complex municipal infrastructure project, the net earnings for the winning contractor would likely fall between $550,000 and $825,000. Including potential change‑order revenue and overtime allowances, a realistic overall budget range for the contract is roughly $5 M to $6 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Corning·California

Top match · 72%

Colusa Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

City of Frazee·Minnesota

70% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

Charles County Government·Maryland

70% match

Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)

Closes 11/4/2026Opened 9/24/2026

City of Cincinnati·Ohio

70% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/8/2026

City of San Diego·California

70% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of South San Francisco·California

69% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

Brazos Valley·Texas

69% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Jackson County Utility Authority·Mississippi

69% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Gilbert·Arizona

68% match

SW0124 Crossroads SW Pump Station Rehab

Closes 11/16/2026Opened 10/16/2026

Georgia City of Hampton·Georgia

68% match

ITB No. 2026- 200 Supply and Installation of Sewage and Wastewater Pumps

Closes 11/19/2026Opened 10/21/2026

City of Cincinnati·Ohio

68% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/9/2026

City of Cincinnati·Ohio

68% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/8/2026

City of Piqua·Ohio

68% match

CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3

Closes 11/19/2026Opened 10/11/2026

City of Cincinnati·Ohio

68% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

City of Somers Point·New Jersey

68% match

Sewer Pump Station Maintenance

Closes 11/10/2026Opened 10/9/2026

City of Camden·South Carolina

68% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

City of Coronado·California

68% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026