Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›RESISTOR ASSEMBLY

U.S. Department Of Defense·Pennsylvania

RESISTOR ASSEMBLY

Closes 7/6/2026$10k – $100kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The opportunity is for the manufacture and delivery of a resistor assembly. The assembly must meet the requirements specified in the contract, including the design, material, and quality standards. The contractor is responsible for the performance of all inspection requirements and must provide records of all inspection work. The contractor must also comply with all applicable laws and regulations, including those related to packaging, preservation, and marking. The key requirements of the opportunity include: • The resistor assembly must be manufactured in accordance with the specified design and quality standards. • The contractor must provide a drawing and explanation for any changes to the design, material, or part number. • The contractor must comply with all applicable laws and regulations, including those related to packaging, preservation, and marking. • The contractor must provide records of all inspection work and comply with the specified inspection requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Adrienne Rubinic

[email protected]

(445) 737-6430

Key dates

Opened
5/22/2026
Closes
7/6/2026

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
334416
Solicitation №
SPRMM126QGE08

Budget estimate

$10,000 – $100,000

The budget for this opportunity is difficult to estimate because the document does not specify the price or payment terms. However, based on the fact that the opportunity is for the manufacture of a resistor assembly, which is a relatively small electronic component, the budget is likely to be in the range of $10,000 to $100,000. The budget will depend on the specific requirements of the opportunity, including the quantity of resistor assemblies to be manufactured and the complexity of the manufacturing process.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 69%

RESISTOR, VARIABLE

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Energy·Ohio

64% match

TECHNOLOGY LICENSING OPPORTUNITY: M-Resistor

Closes 12/8/2026Opened 6/8/2026

U.S. Department Of Defense·United States of America

64% match

59--RESISTOR,VARIABLE,WIRE

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Defense·Oklahoma

62% match

59--RESISTOR,VARIABLE,WIRE

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

62% match

14--ADAPTER ASSEMBLY,MI, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

10--ADAPTER ASSEMBLY,RE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

59--RESISTOR,VARIABLE,WIRE

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

62% match

59--RESISTOR,VARIABLE,NONW

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

61% match

RELAY ASSEMBLY

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Vermont

61% match

CIRCUIT CARD ASSEMB

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

61% match

59--RESISTOR,THERMAL

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

61% match

PROCESSOR ASSEMBLY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

61% match

59--RESISTOR,THERMAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Oklahoma

60% match

B-2 Relay Assembly NSN: 5945-01-442-4318FW

Closes 11/18/2026Opened 10/15/2026

U.S. Department Of Defense·Oklahoma

60% match

Injector Assembly

Closes 11/6/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

60% match

CIRCUIT CARD ASSEMB

Closes 11/30/2026Opened 10/1/2026

U.S. Department Of Defense·Georgia

60% match

Circuit Card Assembly

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·California

60% match

59--RESISTOR,VARIABLE,NONW

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·Pennsylvania

60% match

58--RF MODULE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

59% match

MODULE ASSEMBLY,RIM

Closes 2/12/2027Opened 10/29/2026

U.S. Department Of Defense·United States of America

59% match

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

U.S. Department Of Defense·United States of America

59% match

POWER SUPPLY

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

CIRCUIT CARD ASSEMB

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

59% match

CIRCUIT CARD ASSEMB

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

59% match

28--ENGINE BLOCK ASSEMBLY,

Closes 11/8/2026Opened 10/29/2026