Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›SUNSET ROAD PHASE 1 - DURANGO DRIVE TO DECATUR BOULEVARD

Nevada Government·Nevada

SUNSET ROAD PHASE 1 - DURANGO DRIVE TO DECATUR BOULEVARD

Closes 3/23/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Clark County Department of Transportation is soliciting bids to construct the first phase of the Sunset Road improvement corridor between Durango Drive and Decatur Boulevard. The contract covers complete roadway reconstruction, including widening of the existing pavement to provide at least two travel lanes in each direction, addition of center left‑turn lanes, installation of new signage and pavement striping, and necessary utility adjustments and relocations to accommodate the expanded cross‑section. The work will be performed under typical Nevada construction standards and will require coordination with existing traffic control and utility providers. • Asphalt pavement widening to a minimum of two lanes per direction plus center left‑turn lane • New traffic signage, pavement markings, and striping throughout the project limits • Relocation and adjustment of underground utilities impacted by the widened roadway • Full right‑of‑way grading, sub‑base preparation, and drainage improvements as needed • Completion of all required inspections, testing, and close‑out documentation

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Basquiát‑Jones

scott.basquiat‑[email protected]

(702) 455-4441

Key dates

Opened
3/2/2026
Questions due
3/16/2026
Pre-bid meeting
3/9/2026
Closes
3/23/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
607866-26

Budget estimate

$5,000,000 – $15,000,000

No budget is disclosed in the solicitation. Based on typical Nevada lane‑mile construction costs (roughly $3 M–$5 M per mile for urban arterial widening) and assuming a 2–3 mile segment, the total contract value is likely in the $5 M–$15 M range. Factors influencing the final amount include the extent of utility relocations, traffic management requirements, and any unforeseen ground conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Clark County·Nevada

Top match · 66%

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

66% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

65% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Tucson·Arizona

63% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

Idaho Transportation Department·Idaho

63% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Transportation·Wyoming

62% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Bluewing Civil Consultants, LLC.·Louisiana

62% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Metro Development District·Florida

62% match

N. Sunlake Blvd. Segment 4 Phase 1

Closes 11/12/2026Opened 10/1/2026

City of Coronado·California

62% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Ankeny·Iowa

61% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

City of Charlotte·North Carolina

61% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Shawnee·Kansas

61% match

Notice of Hearing - Shawnee Industrial Park - 18760 Johnson Drive

Closes 4/30/2032Opened 4/30/2024

City of Gainesville - Procurement Division·Florida

61% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Texas Department of Transportation·Texas

60% match

STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INSTALL ILLUMINATION

Closes 11/4/2026Opened 10/7/2026

Idaho Transportation Department·Idaho

60% match

Key No. 21860 US-91, PARK LAWN TO SIPHON ROAD, CHUBBUCK

Closes 11/10/2026Opened 9/25/2026

County of DeKalb, GA·Georgia

60% match

Candler Road-Flat Shoals Parkway LCI Master Plan Study Update

Closes 11/23/2026Opened 9/28/2026

City of Austin·Texas

60% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

County of Okaloosa·Florida

60% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

City of Mauldin·South Carolina

60% match

SUNSET PARK SPORTS FIELDS LIGHTING PHASE 1

Closes 11/2/2026Opened 9/29/2026

City of Fort Wayne·Indiana

60% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of North Augusta·South Carolina

60% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

County of DeKalb, GA·Georgia

60% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Texas Jefferson County·Texas

60% match

Garth Road Reconstruction Phase 1

Closes 11/4/2026Opened 10/13/2026

Northwest Arkansas Razorback Regional Greenway Alliance·Arkansas

60% match

REQUEST FOR BIDS – RAZORBACK GREENWAY WAYFINDING SIGNS PROJECT

Closes 11/3/2026Opened 10/11/2026