Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arizona
  4. ›Construction
  5. ›Silverbell Road Roadway Improvements - El Camino del Cerro…

City of Tucson·Arizona

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026$12M – $18MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Tucson is seeking qualified contractors to design and construct a comprehensive roadway upgrade along Silverbell Road, El Camino del Cerro, and Sweetwater Drive, totaling approximately 3.27 miles. The scope includes widening to four lanes, installing medians, curbs, sidewalks, a multi‑use path, traffic signals, street lighting, landscaping, irrigation, utility relocation, and drainage improvements. The project is budgeted at **more than $10 million** and requires compliance with city, state, and federal construction standards, SBE/DBE participation goals, extensive bonding and insurance, and adherence to heat‑safety and forced‑labor certification requirements. Bids must be submitted electronically by September 21, 2026, with a pre‑bid conference on August 27, 2026 (optional). • Total roadway length: 3.27 mi (2.63 mi Silverbell Rd., 0.50 mi El Camino del Cerro, 0.14 mi Sweetwater Dr.) • Four‑lane road with medians, sidewalks, multi‑use path, lighting, signals, landscaping, irrigation, utility work, drainage • Estimated contract value > $10 M; SBE goal 5 % • Pre‑bid conference (optional): August 27, 2026 1:00 pm AZ time (virtual) • Bid submission deadline: September 21, 2026 2:00 pm AZ time (online portal) • Required bid bond = 10 % of bid amount; performance & payment bonds = 100 % of contract price • Mandatory insurance (CGL $2 M per occurrence, Auto $1 M, Workers’ Comp statutory) and a heat‑safety plan • All subcontractors > $5,000 must be listed; SBE/DBE plan required • Contractor must hold a valid Arizona contractor’s license and comply with forced‑labor certification.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kyle DeWitte(Senior Contract Officer)

[email protected]

(520) 837-6601

Key dates

Opened
8/19/2026
Questions due
9/25/2026
Pre-bid meeting
8/27/2026
Closes
11/20/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
270146

Budget estimate

$12,000,000 – $18,000,000

The solicitation lists a “Price Range: More than $10,000,000.” Based on typical unit costs for four‑lane urban street construction in Arizona (approximately $8–12 M per mile for full street, median, sidewalks, utilities, and lighting), the 3.27‑mile scope would likely fall between $12 M and $18 M. The lower bound reflects a minimal design‑build approach; the upper bound assumes higher land acquisition, utility relocation, and landscaping costs. Therefore a realistic award amount is estimated at **$12 M – $18 M**.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Tucson·Arizona

Top match · 85%

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026

City of Pueblo·Colorado

85% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

City of Morgan Hill·California

84% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

City of Morgan Hill·California

83% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

City of Bullhead City·Arizona

82% match

HANCOCK ROAD PAVING PROJECT

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Transportation·Arizona

81% match

AZ BL COLO 7528(1) Burro Creek Road

Closes 11/17/2026Opened 10/15/2026

Arizona City of Chandler·Arizona

81% match

Invitation to Bid - City of Chandler Ray Road and Dobson Road Intersection Improvements, Project No. ST2103.401, CHN-0(255)D, T0527 01C

Closes 11/19/2026Opened 9/3/2026

City of Redlands·California

81% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

City of Toledo·Ohio

81% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

Georgia City of Powder Springs·Georgia

80% match

IFB # 26-003 - Powder Springs Access Road Project

Closes 11/6/2026Opened 10/9/2026

Town of Church Point·Louisiana

80% match

2026-27 ROAD IMPROVEMENTS PROJECT PHASE 1

Closes 11/10/2026Opened 10/14/2026

Town of Prosper·Texas

80% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

City of Cincinnati·Ohio

80% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Fort Myers·Florida

80% match

Asphalt Roadway Resurfacing and Rehabilitation

Closes 11/2/2026Opened 10/1/2026

City of Foley·Alabama

80% match

Wilson Ave. & Equestrian St. Construction

Closes 11/17/2026Opened 10/22/2026

D.R. Horton - Texas, Ltd. on behalf of Montgomery County Municipal Utility District No. 202A·Texas

80% match

Paving and Appurtenances to Serve Silverthorne Section 4

Closes 11/18/2026Opened 10/26/2026

Town of Prosper·Texas

80% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

City of El Paso De Robles·California

80% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

City of Rancho Palos Verdes·California

80% match

Miraleste Traffic Calming Measures, CIP No. 8858

Closes 11/20/2026Opened 10/27/2026

Town and County of Nantucket·Massachusetts

80% match

Newtown Road Reconstruction Project

Closes 11/20/2026Opened 10/23/2026

Town of Camp Verde·Arizona

80% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

80% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

County of DeKalb, GA·Georgia

80% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Nevada Government·Nevada

79% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Cincinnati·Ohio

79% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026