The Kenai Peninsula Borough (KPB) is seeking qualified contractors to perform repair work on the Chakok Road Bridge (Bridge #0979) located on the North Fork of the Anchor River in the borough. The scope covers removal and replacement of deteriorated timber decking, stringers, and guardrails; recoating and repair of steel truss members, floor beams, pile caps, and steel piles; replacement of advanced‑decay timber retaining walls at both abutments; and installation of erosion‑control measures such as rip‑rap. The contractor must maintain emergency access throughout construction, adhere to a strict traffic‑closure window (11 PM‑6 AM), and comply with existing environmental permits related to anadromous fish habitats. No temporary crossing will be provided; the bridge must stay operational for emergency services. Bids are to be submitted electronically (or as sealed hard copies) by 6 PM on October 21, 2026.
• Scope: steel‑coat repair, timber deck and retaining‑wall replacement, erosion control, signage updates.
• Schedule: pre‑bid conference Oct 8, 2026; Q&A closes Oct 15, 2026; bid deadline Oct 21, 2026; substantial completion required by Feb 28, 2027.
• Financials: estimated repair cost $530,000–$655,000; performance and payment bonds required for contracts ≥ $100,000; liquidated damages $300 per day for delays.
• Requirements: electronic bid‑bond (5 % of bid), compliance with Alaska Title 36 wage rules, local‑preference considerations, and mandatory warranty of one year.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.