City of Whittier is seeking a qualified contractor to replace Lift Station 5, a critical component of the municipal wastewater system. The scope includes complete design‑build of a new sub‑mersible lift station, demolition of the existing structure, utility connections, and septage removal from six municipal septic tanks. The contract is a fixed‑price, lump‑sum award with an optional additive for septic‑tank pumping on a per‑gallon basis, and it is subject to stringent state and federal compliance requirements (American Iron & Steel, DBE, EEO, prevailing‑wage, and ADEC environmental approvals).
• Replace and commission a new sub‑mersible wastewater lift station (wet‑well, valve‑vault, pumps, controls, electrical, piping, and fiberglass building).
• Demolish existing Lift Station 5 and dispose of associated equipment.
• Pump, transport, and dispose of approx. 82,000 gal of septage from six septic tanks (additive alternate).
• Must meet AIS, DBE (4.74 % goal), EEO, and prevailing‑wage (Alaska Title 36 & Federal Davis‑Bacon) requirements; liquidated damages apply for delays.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.