Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Berlin Culvert Stabilization Slip Lining

Massachusetts Town of Williamstown·Massachusetts

Berlin Culvert Stabilization Slip Lining

Closes 10/21/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Williamstown is seeking bids to stabilize an existing deteriorated culvert beneath Berlin Road. The work requires installing a structural pipe‑arch liner inside the culvert, grouting the annular space around the liner, and constructing end bulkheads to provide permanent structural stability. This civil‑engineering construction project falls under highway and road maintenance services and will be performed by a contractor experienced in underground infrastructure repair. • Install a pipe‑arch liner and perform annular space grouting. • Construct end bulkheads for structural integrity. • Provide long‑term stabilization of a road‑underpass culvert. • Must submit a paper‑based bid; electronic quotes not accepted. • Contact Craig Clough for procurement details.

Attached files

Contact

Craig Clough(Purchaser)

[email protected]

(413) 597-8363

Key dates

Opened
9/30/2026
Pre-bid meeting
10/7/2026
Closes
10/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BD-27-1734-DPW10-DPW00-133887

Budget estimate

$200,000 – $500,000

No budget figures are disclosed, but similar culvert stabilization projects involving pipe‑arch liners and bulkhead construction typically range from $200 k to $500 k depending on culvert size, site access, and material costs. Factors such as the length and diameter of the existing culvert, required depth of excavation, and local labor rates in Massachusetts will drive the final price.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Brewster·Massachusetts

Top match · 68%

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

City of Charlotte·North Carolina

63% match

Collective Culverts 1 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/11/2028

City of Sidney·Ohio

63% match

26-26 Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

Saline County·Kansas

63% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Marysville, Ohio·Ohio

63% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Ladue·Missouri

62% match

2025 Culvert Repairs Project - Ladue, MO

Closes 11/5/2026Opened 10/6/2026

City of Anderson·South Carolina

62% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

City of Ann Arbor·Michigan

62% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

NYS Cambria, Town of·New York

62% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Kossuth County Drainage District No. 20 Main 2·Iowa

62% match

Kossuth County Drainage District No. 20 Main 2 Tile Improvement BMI Project No. 25X.138901

Closes 11/17/2026Opened 10/29/2026

City of Lynchburg·Virginia

61% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Gary Sanitary District·Indiana

61% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

61% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 11/12/2024

New York State Department of Transportation·New York

61% match

D265814 CULVERT REPLACEMENTS - Route 22 and Route 67 Culverts in the Towns of Ballston, Milton & Willsboro.

Closes 11/12/2026Opened 10/20/2026

U.S. Department Of Defense·Indiana

61% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

City of Charlotte·North Carolina

61% match

Moorland Dr 3831 Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

City Utilities·Indiana

61% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

City of Sidney·Ohio

60% match

Brookside Park Culvert

Closes 11/5/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

60% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016

St. John the Baptist Parish Government·Louisiana

60% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026

Arkansas Department of Transportation - Equipment and Procurement·Arkansas

60% match

Corrugated Pipe Culvert Supply Contract

Closes 11/10/2026Opened 10/27/2026

Town of Manchester·Connecticut

60% match

ENGINEERING SERVICES - DRY BROOK CULVERT REPLACEMENT

Closes 11/10/2026Opened 10/13/2026

City of Appleton, WI·Wisconsin

60% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

Virginia Department of Transportation·Virginia

60% match

B32_ 2027 CULVERT REHAB

Closes 11/18/2026Opened 10/13/2026

Georgia City of Covington·Georgia

60% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026