Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›12" Precast Concrete Curbing for Bicycle Lanes

City of Cambridge·Massachusetts

12" Precast Concrete Curbing for Bicycle Lanes

Closes 5/21/2026$50k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cambridge is seeking bids for the installation of 12” precast concrete curbing for bicycle lanes. The project includes furnishing and installing precast concrete curbing, removing existing curbing, and resetting curbing as needed. Bidders must have experience in installing precast concrete curbing and must provide references from at least three locations where they have provided similar services. The city reserves the right to reject any bid that does not meet the quality requirements. • The bidder must have at least five years of municipal experience in general contracting. • The bidder must have the ability and equipment to perform the installation of 12” precast concrete curbing. • The bidder must provide references from at least three locations where they have provided similar services. • The bidder must comply with the Cambridge Employment Plan and the Americans with Disabilities Act. • The bidder must provide a bid bond and a performance bond. • The bidder must provide insurance certificates and comply with the insurance requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Vilsabel Selman

[email protected]

(617) 792-3844

Key dates

Opened
4/30/2026
Questions due
5/13/2026
Closes
5/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238110
Solicitation №
COC-CIFB-FY26-30953

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work, which includes furnishing and installing precast concrete curbing, removing existing curbing, and resetting curbing as needed. The total contract amount is not specified, but the estimated quantities are provided. Assuming an average cost of $50 per linear foot of precast concrete curbing, the total cost for 250 linear feet of curbing would be around $12,500. Additionally, the cost of removal and resetting of curbing would add to the total cost. Considering these factors, a rough estimate for the project could be between $50,000 and $200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Bernardino County·California

Top match · 68%

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Nyc Department of Design and Construction·New York

68% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Nyc Department of Design and Construction·New York

68% match

85027B0025 - HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Santa Cruz·California

67% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

California Department of Transportation·California

67% match

SB Minor B 03A4243 - Bicycle Railing Installation - Placer County

Closes 11/12/2026Opened 10/29/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

67% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

City of Charlotte·North Carolina

67% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

San Bernardino County·California

67% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

Lake County, CA·California

66% match

South Main Street and Soda Bay Rd Widening and Bike Lanes Project

Closes 11/30/2026Opened 10/31/2026

City of Bartow, FL·Florida

66% match

Main Street Concrete Curbing, Sidewalk, and Driveways.

Closes 11/25/2026Opened 10/20/2026

Maryland Baltimore City Department of Transportation·Maryland

66% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

City of Madison·Mississippi

66% match

Concrete Services 2027

Closes 11/20/2026Opened 10/22/2026

City of Vernon·California

66% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Pasadena·California

66% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

66% match

Concrete Jersey Barriers-Queen Lane RRD

Rolling / TBD closeOpened 9/2/2026

City of Bangor·Maine

66% match

P27-36 Curb Replacement BGR

Closes 11/18/2026Opened 10/23/2026

City of Tucson·Arizona

66% match

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026