Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

City of Santa Cruz·California

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes in 4 days$1.5M – $3MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Santa Cruz is soliciting sealed bids to construct multiple unsignalized crossing improvements under HSIP Cycles 11 & 12. The work includes installing concrete curbs, gutters, sidewalks, curb ramps, roadway signs, pedestrian‑activated beacons, striping, pavement markings, and associated landscape and lighting elements across several street intersections. The contractor must provide all labor, materials, equipment, and transportation, comply with City, State, and Federal specifications (including Buy‑America and prevailing‑wage requirements), and complete the project within 50 working days. • Scope: Concrete curb/sidewalk installation, curb ramps, signage, pedestrian‑activated rapid flashing beacons (solar‑powered), striping, pavement markings, and related landscaping. • Locations: Laurel St – Blackburn St; Broadway – Pennsylvania Ave; Seabright Ave – Logan St (Cycle 11) and High St – Cardiff Pl; Soquel Ave – Poplar Ave (Cycle 12). • Contract type: Sealed competitive bid (Invitation for Bids). • Bid submission deadline: 2:00 PM PST, November 5 2026, at Public Works Dept., 809 Center St., Room 201, Santa Cruz, CA 95060. • Performance period: 50 working days from notice to proceed. • Mandatory requirements: California Class “A” contractor license, prevailing‑wage compliance, Buy‑America, 5 % retention, performance and payment bonds (100 % of contract price). • Deliverables: Complete construction, testing, and warranty (five‑year warranty on tactile tiles and beacon systems). • Evaluation: Lowest responsible and responsive bid will be awarded.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Danilo Cabreros

[email protected]

(831) 420-5420

Key dates

Opened
10/21/2026
Closes
11/5/2026
Duration
50 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB No. PW-0332

Budget estimate

$1,500,000 – $3,000,000

The solicitation does not disclose the contract value. Based on typical unit costs for curb/sidewalk construction ($150‑$250 per linear foot), roadway signage ($2,000‑$5,000 each), and solar‑powered beacon systems ($8,000‑$12,000 each), and assuming roughly 2,500 linear feet of curb/sidewalk plus 10 beacons and associated signage across the five intersections, the total bid could fall between $1.5 million and $3 million. Larger contingencies for site‑specific conditions, mobilization, and bonding requirements could push the high end toward $3.5 million. Therefore a reasonable estimate is $1.5 M – $3 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pasadena·California

Top match · 90%

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

City of Santa Cruz·California

85% match

Santa Cruz Gateway Landscape Improvements

Closes 11/5/2026Opened 9/22/2026

City of Pasadena·California

85% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Salinas·California

85% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

County of Santa Cruz·California

83% match

SOQUEL SAN JOSE RD PM 5.55 STORM DAMAGE REPAIR PROJECT, FEDERAL PROJECT No. ER-15J2 (004)

Closes 11/5/2026Opened 10/8/2026

Nyc Department of Design and Construction·New York

83% match

85027B0025 - HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Oregon Department of Transportation·Oregon

82% match

US101 At Market Ave Enhanced Crossing Project

Closes 11/10/2026Opened 10/26/2026

City of Pasadena·California

82% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Hermosa Beach·California

82% match

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

Texas City of San Antonio·Texas

82% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Morgan Hill·California

82% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

City of Fresno·California

82% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

Texas City of San Antonio·Texas

82% match

2027 Task Order Contract for Street Rehabilitation Package 10 Flatwork

Closes 12/8/2026Opened 10/30/2026

City of Sacramento·California

82% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Town of Westwood·Massachusetts

82% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

County of Santa Cruz·California

82% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

City of San Clemente·California

82% match

FY 2027 Arterial Street Improvement

Closes 11/5/2026Opened 10/15/2026

Texas City of San Antonio·Texas

82% match

2027 Task Order Contract for Street Rehabilitation Package 4 Flatwork

Closes 11/24/2026Opened 10/21/2026

City of San Antonio·Texas

82% match

23-04203-06 2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

City of Santa Ana·California

82% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

City of San Antonio·Texas

82% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of Culver City·California

82% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Morgan Hill·California

82% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

City of Napa·California

81% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

City of San Antonio·Texas

81% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026