The City of Soldotna is soliciting qualified firms to construct a roughly 4,400 sf pre‑engineered metal building addition to the north end of the existing Soldotna Field House. The scope includes demolition, new foundation and slab, structural steel frame, insulated metal wall and roof panels, doors and hardware, fire‑suppression and fire‑alarm systems, mechanical (hydronic heating, heat‑trace), electrical power and lighting, site grading, utility extensions, paving, and landscaping. The contract will be a single‑prime, stipulated‑price agreement with performance and payment bonds required, and a substantial‑completion date of 30 September 2027.
• New 4,400 sf PEMB storage addition (steel frame, insulated panels, doors, hardware).
• Mechanical, electrical, and fire‑protection systems integration (sprinklers, alarm, HVAC).
• Site work: demolition, grading, utility upgrades, asphalt paving, sidewalks, landscaping.
• Required bonding (5 % bid bond if > $100k, 100 % performance/payment bonds), Alaska business & contractor licenses, tax‑compliance certificate, and local‑bidder preference provisions.