Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Civil Engineering
  5. ›SUNSET ROAD PHASE 1 - DURANGO DRIVE TO DECATUR BOULEVARD

Nevada Government·Nevada

SUNSET ROAD PHASE 1 - DURANGO DRIVE TO DECATUR BOULEVARD

Closes 3/25/2026$5M – $20MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Clark County is inviting bids for the Sunset Road Phase 1 project, which includes asphalt pavement widening, center left-turn lanes, signage and striping, utility adjustments and relocations, and other appurtenances. The project limits are from Durango Drive to Decatur Boulevard. The bid documents include a geotechnical report, and bidders are required to submit their questions by the specified deadline. The bid closing date is March 25, 2026. Some key aspects of the project include: • Asphalt pavement widening to provide minimum two travel lanes in each direction • Center left-turn lanes • Signage and striping • Utility adjustments and relocations • Other appurtenances as may be necessary to construct a complete and functional roadway

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Basquiat-Jones(Bid Contact)

[email protected]

(702) 455-4441

Key dates

Opened
3/2/2026
Questions due
3/16/2026
Pre-bid meeting
3/9/2026
Closes
3/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
607866-26 Addendum 2

Budget estimate

$5,000,000 – $20,000,000

Based on the project scope, which includes asphalt pavement widening, center left-turn lanes, signage and striping, utility adjustments and relocations, and other appurtenances, the budget for this project could be substantial. A rough estimate for a road construction project of this scale could be in the range of $5 million to $20 million, considering the costs of materials, labor, and equipment. However, this is a rough estimate and the actual budget could be higher or lower, depending on various factors such as the complexity of the project, the number of bidders, and the final bid price.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Clark County·Nevada

Top match · 66%

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

66% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

65% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Tucson·Arizona

63% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

Idaho Transportation Department·Idaho

63% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Transportation·Wyoming

62% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Bluewing Civil Consultants, LLC.·Louisiana

62% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

State of Delaware DOT·Delaware

62% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Metro Development District·Florida

62% match

N. Sunlake Blvd. Segment 4 Phase 1

Closes 11/12/2026Opened 10/1/2026

City of Coronado·California

62% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Ankeny·Iowa

61% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

City of Charlotte·North Carolina

61% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Idaho Transportation Department·Idaho

61% match

Key No. 21860 US-91, PARK LAWN TO SIPHON ROAD, CHUBBUCK

Closes 11/10/2026Opened 9/25/2026

City of Shawnee·Kansas

61% match

Notice of Hearing - Shawnee Industrial Park - 18760 Johnson Drive

Closes 4/30/2032Opened 4/30/2024

City of Gainesville - Procurement Division·Florida

61% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Texas Department of Transportation·Texas

60% match

STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INSTALL ILLUMINATION

Closes 11/4/2026Opened 10/7/2026

County of DeKalb, GA·Georgia

60% match

Candler Road-Flat Shoals Parkway LCI Master Plan Study Update

Closes 11/23/2026Opened 9/28/2026

City of Austin·Texas

60% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

County of Okaloosa·Florida

60% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026