Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Construction
  5. ›Palomino Blvd. Full Depth Pavement Reconstruction

Town of Fountain Hills·Arizona

Palomino Blvd. Full Depth Pavement Reconstruction

Closes 11/13/2025$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Fountain Hills is seeking a qualified General Contractor to perform full-depth pavement reconstruction on Palomino Drive. The project involves demolishing the existing asphalt pavement, excavating to a depth of 10 inches, and constructing a new structural pavement section. The contractor will be responsible for mobilization, demolition, subgrade preparation, utility adjustments, traffic control, and site restoration. The project must be completed in accordance with the MAG Specifications and the MAG Supplement. Key points to consider: • The project is located on Palomino Drive, from Palisades Boulevard to Fountain Hills Boulevard, within the Town of Fountain Hills, AZ. • The total roadway length is approximately 1.35 miles (7,130 linear feet), with an existing pavement width of 60 feet curb-to-curb. • The contractor must provide all necessary labor, materials, and equipment to complete the project. • The project requires coordination with the Fountain Hills Sanitary District for manhole and valve adjustments. • The contractor must maintain safe access for local residents and emergency vehicles at all times. • The project is subject to various regulations, including the MAG Uniform Standard Specifications and the Town of Fountain Hills Supplement to the MAG Uniform Standard Details for Public Work Construction.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rob Durham

[email protected]

(480) 816-5128

Key dates

Opened
9/18/2025
Questions due
10/30/2025
Closes
11/13/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
IFB-2025-033

Budget estimate

$1,000,000 – $5,000,000

The budget for this project can be estimated based on the scope of work and industry standards. Considering the project involves full-depth pavement reconstruction on a 1.35-mile stretch of road, the cost could be substantial. A rough estimate for a project of this nature could be in the range of $1 million to $5 million, depending on factors such as labor costs, material prices, and equipment requirements. This is a rough estimate and may not reflect the actual budget, as the document does not provide a specific budget or cost estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fort Wayne·Indiana

Top match · 71%

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Clark County·Nevada

71% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

City of Fargo·North Dakota

71% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Waco·Texas

71% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

City of Broken Arrow·Oklahoma

70% match

Dallas Street Rehabilitation:

Closes 11/17/2026Opened 9/29/2026

Henrico County Government·Virginia

70% match

ITB No. 26-3010-10EAR - Annual Contract for Paver Laid Full Depth Reclamation

Closes 11/4/2026Opened 10/6/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

Maryland Baltimore City Department of Transportation·Maryland

70% match

TR-26006 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

Nevada Government·Nevada

69% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Toledo·Ohio

69% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

San Joaquin County Department of Public Works·California

69% match

Main Street Resurfacing, Federal Aid Project No. STPL‑5929(334)

Closes 11/5/2026Opened 10/6/2026

California Department of Transportation·California

69% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

City of Stillwater·Oklahoma

69% match

Full Depth Repair - 27TR06

Closes 11/18/2026Opened 10/17/2026

Maryland Baltimore City Department of Transportation·Maryland

69% match

TR-27003 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

City of Perrysburg·Ohio

69% match

WOO SR 199-29.11 Louisiana Avenue

Closes 11/5/2026Opened 10/14/2026

City of Vernon·California

69% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Torrance·California

69% match

Residential and Arterial Pavement Improvement, I-159/I-139

Closes 11/18/2026Opened 10/18/2026

City of Charlotte·North Carolina

69% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

City of Modesto, CA·California

69% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 11/3/2026Opened 9/1/2026

City of Toledo·Ohio

69% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Miramar·Florida

69% match

Milling and Resurfacing of Miramar Parkway from SW 172 Ave to SW 184 Ave

Closes 11/19/2026Opened 10/22/2026

Navajo Technical University·New Mexico

69% match

RFP – Campus Parking Lots & Circular Road | Pavement Rehabilitation & Repaving

Closes 11/20/2026Opened 10/16/2026

Maryland Baltimore City Department of Transportation·Maryland

68% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

City and County of San Francisco·California

68% match

EXT DPW | PW SAN BRUNO AVE PAVE RENOV

Closes 11/4/2026Opened 9/29/2026

Nevada Government·Nevada

68% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026