Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›2026 Sidewalk Gaps Project

City of Toledo·Ohio

2026 Sidewalk Gaps Project

Closes 3/17/2026$1M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Toledo is soliciting bids to add or reconstruct sidewalks, pedestrian ramps, minor drainage improvements, and roadway markings along three linear corridors (McGregor Lane, Angola Road, and Heatherdowns Boulevard). The work includes removal of existing curbs, installation of walk‑and‑swale drainage, utility coordination, replacement of storm‑sewer conduit, fire‑hydrant removal, and water‑line adjustments. Bids must be submitted electronically via PlanetBids, include all required documentation (construction paperwork, insurance, child‑support affidavit, workers‑comp certificate, tax‑exempt certificate, bid guaranty, and signed contract), and comply with prevailing‑wage, SBE utilization, and insurance requirements. The contract is expected to last 90 days from notice to proceed. • Reconstruct sidewalks and install pedestrian ramps across three corridors in Toledo. • Provide minor drainage (walk‑and‑swale), storm‑sewer conduit, utility adjustments, and roadway markings. • Submit electronic bids with a 5 % bid guaranty (max $200,000) and a 100 % performance bond; comply with prevailing‑wage, SBE goals, insurance, and child‑support affidavit requirements. • Project duration is 90 days; work must begin after award and issuance of a notice to proceed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
2/20/2026
Questions due
3/11/2026
Closes
3/17/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
10008503

Budget estimate

$1,000,000 – $3,000,000

Because the solicitation does not disclose a contract value, we estimate based on comparable municipal sidewalk/streetscape projects in mid‑size U.S. cities. Typical unit costs for sidewalk reconstruction range from $150‑$250 per linear foot, and the three corridors together encompass roughly 6‑8 miles (≈31,680‑42,240 ft). Applying the mid‑range cost ($200/ft) yields a contract value near $6‑8 million, but the City’s “bid valid duration” and “performance bond” caps (max $200 k) suggest a smaller scope, perhaps limited to targeted gaps rather than full‑length reconstruction. A conservative ballpark therefore falls between $1 million and $3 million, reflecting the limited “gap” focus, 90‑day schedule, and typical municipal budgeting for such work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Sandy Springs·Georgia

Top match · 76%

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Ormond Beach - Purchasing Office·Florida

72% match

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

City of Portland·Maine

72% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Salinas·California

71% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

NYS Rochester, City of·New York

71% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

County of DeKalb, GA·Georgia

71% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Pocatello·Idaho

70% match

2026 Old Town Sidewalk Removal and Replacement Project Round 2

Closes 11/20/2026Opened 10/20/2026

City of Pasadena·California

70% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Pasadena·California

70% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

County of DeKalb, GA·Georgia

70% match

Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months)

Closes 11/12/2026Opened 9/28/2026

Maryland Carroll County Government - Procurement·Maryland

70% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Georgia DeKalb County Government·Georgia

69% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Ohio City of Westerville·Ohio

69% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Iowa City·Iowa

69% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Santa Cruz·California

69% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

Connecticut Town of Voluntown·Connecticut

69% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

City of Fresno·California

68% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026