Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Civil Engineering
  5. ›Coggeshall Street Phase 3 Sewer Separation Project (Rebid)

Massachusetts City of New Bedford·Massachusetts

Coggeshall Street Phase 3 Sewer Separation Project (Rebid)

Closes 11/26/2025$5M – $15MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of New Bedford is seeking bids for the Coggeshall Street Phase 3 Sewer Separation Project (Rebid). The project involves wastewater system improvements, including the installation of new drain, sewer, and water piping, as well as the construction of a new outfall with salt marsh restoration and bank stabilization. The project also includes the removal and replacement of existing PCCP water transmission main, the cutting and removal of abandoned contaminated sewer pipeline, and other miscellaneous work. The key aspects of the project include: • Furnishing and installing approximately 8,500 linear feet of 10 in through 48” drain pipe • Furnishing and installing approximately 2,000 linear feet of 3’x4.5’ and 4’x6’ box culvert • Furnishing and installing approximately 700 linear feet of 8- in through 12-inch sewer pipe • Sewer and drain manholes and catch basins • Construction of a new outfall with salt marsh restoration and bank stabilization • Removal and replacement of existing PCCP water transmission main • Cutting and removal of abandoned 54” contaminated sewer pipeline • Furnishing and installing approximately 4,000 linear feet of 6-in through 48-in water main • Stormwater control measure removal and site restoration • Utility relocations • Trenchless cured-in-place liner rehabilitation of existing sewers and drains • Service connections • Connection to the existing system • Earthwork, excavation support and protection • Dewatering and drainage • Paving and roadway restoration work including the installation of new traffic signal equipment • Traffic management • Landscaping • Coordination with the MassDOT I-195 Viaduct Design-Build project (MassDOT Project 606527) • Private utility coordination • All miscellaneous work and cleanup as specified or required to complete the work

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Molly Gilfeather Rodriguez

[email protected]

(508) 979-1433

Key dates

Opened
11/12/2025
Questions due
11/17/2025
Closes
11/26/2025

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
26439030R

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work. Considering the installation of approximately 8,500 linear feet of drain pipe, 2,000 linear feet of box culvert, and 700 linear feet of sewer pipe, as well as other miscellaneous work, the total cost of the project is likely to be substantial. A rough estimate for the project could be between $5 million and $15 million, considering the costs of materials, labor, and equipment. However, this is a rough estimate and the actual budget may vary depending on various factors such as the complexity of the project, the number of bidders, and the city's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Elgin·Illinois

Top match · 74%

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Elgin·Illinois

73% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

Town of Honea Path·South Carolina

71% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of Columbus Ohio·Ohio

71% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

City of Lebanon·Indiana

71% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Ponca·Oklahoma

71% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Mansfield·Texas

71% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

Connecticut Town of Fairfield·Connecticut

70% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of Cincinnati·Ohio

70% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

Maryland Baltimore County Government·Maryland

70% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

City of The Colony·Texas

70% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

Erie County·New York

70% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

City of Pearland·Texas

69% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026

Maryland Baltimore County Government·Maryland

69% match

18182 SX0 Eastpoint Relief Sewer - Gough Street POSTPONED UNTIL FURTHER NOTICE

Closes 3/30/2029Opened 3/24/2021

Georgia City of Lagrange·Georgia

69% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

The City of Columbus·Ohio

69% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

James City County·Virginia

69% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026