The Omaha Public Schools are seeking a qualified contractor to fully resurface the running track at South High School’s Collin Stadium. The work includes removal and disposal of the existing surface, crack repairs, installation of a new 13 mm synthetic track system, and striping, along with site preparation, utility coordination, and erosion‑control measures. The contract will be awarded in mid‑October 2026, with construction slated to begin no earlier than June 1 2027 and substantial completion required by July 30 2027. The bid package is a lump‑sum solicitation with a mandatory pre‑bid meeting and strict licensing, bonding, insurance, and warranty requirements, including use of an ASBA‑certified track builder and compliance with Nebraska and OPS standards.
• Remove existing track surface and haul off‑site; repair structural & non‑structural cracks.
• Install new polyurethane‑rubber synthetic track (≈ 45,135 sf) with permanent markings, meeting ASBA and ASTM specifications.
• Provide required bonds, insurance, 5‑year joint warranty, and adhere to utility notification (48 hr) and barricade standards.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.