The project involves the rehabilitation of the Brush Creek 15 Dam in Mercer County, West Virginia. The work consists of clearing and grubbing, structure removal, pollution control, and other construction activities. The contractor will be required to submit a Clearing and Grubbing Plan and a Demolition Plan for approval before beginning work. The project also involves the abandonment of existing trench drain collector and outlet pipes by placing a non-shrink grout mix through a tremie hose.
• The project requires the contractor to take measures to control erosion and minimize the production of sediment and other pollutants.
• The contractor will be responsible for disposing of refuse materials resulting from structure removal and other construction activities.
• The project involves the use of various materials, including geomembrane liners, gaskets, metal battens, bolts, embed channels, and sealant.
• The contractor will be required to perform quality control tests and provide records of grouting operations.