Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Colorado guideColorado Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Colorado
  4. ›Civil Engineering
  5. ›Cottonwood Creek Stabilization Academy to Union

City of Colorado Springs·Colorado

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026$4M – $6MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Colorado Springs seeks a qualified contractor to design and construct a comprehensive creek‑stabilization and channel‑rehabilitation project along Cottonwood Creek between Academy Boulevard and Union Boulevard. The work includes earthwork, installation of grouted boulder drop structures, steel‑sheet‑pile cutoff walls, pipe outfalls, various riprap systems, extensive vegetative and erosion‑control measures, and all associated site‑preparation, temporary traffic control, and final inspection activities. The contract is a fixed‑unit‑price, not‑to‑exceed agreement valued at approximately $4 million to $6 million, with an 18‑month performance period and extensive regulatory compliance (USACE Section 404, CDPHE storm‑water, local permits). The City will require performance, labor‑&‑materials, and maintenance bonds equal to 100 % of the contract amount, and comprehensive insurance coverage. • Scope: Grouted boulder drop structures, steel sheet‑pile walls, pipe outfall replacement, riprap, vegetation, erosion control, and full site work (≈ 4,325 ft of creek). • Budget: $4‑$6 M NTE, 5 % retainage, bonds & insurance to be included in price. • Schedule: Proposals due Nov 9 2026; anticipated start Jan 2027; 18‑month completion; USACE 404 permit valid through Oct 2031 with post‑construction monitoring for 5 years. • Regulatory: Must secure USACE Section 404, CDPHE storm‑water, local traffic/grade‑control permits, and comply with environmental mitigation and ADA requirements.

Attached files

Contact

Crystal Abeyta(Primary Procurement Contact)

[email protected]

Key dates

Opened
10/9/2026
Questions due
10/23/2026
Pre-bid meeting
10/15/2026
Closes
11/9/2026
Projected award
12/1/2026
Duration
18 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237990
Solicitation №
R26-093CA

Budget estimate

$4,000,000 – $6,000,000

Based on the City’s internal estimate of $4 million to $6 million for the entire contract, the contractor’s revenue (and thus budget) is expected to fall within that range. The estimate assumes full award of the not‑to‑exceed amount, inclusion of required bonds and insurance costs, and no significant change‑order inflation. Factors that could shift the budget include scope modifications, unforeseen site conditions, or additional mitigation work required by USACE.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of El Cajon·California

Top match · 82%

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

DeSoto Parish Police Jury·Louisiana

82% match

2026 DPPJ Road and Drainage Improvements Cotton Belt

Closes 11/10/2026Opened 10/15/2026

Texas Williamson County·Texas

82% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

City of Pueblo·Colorado

82% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

City of Charlotte·North Carolina

81% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

City of Anderson·South Carolina

81% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

City of Charlotte·North Carolina

81% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Thornton·Colorado

81% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

City of Blue Springs·Missouri

81% match

Woods Chapel Park Lift Station

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

81% match

Crestmont Drive (4724) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/10/2026

Clark County·Nevada

81% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Austin·Texas

81% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Charlotte·North Carolina

81% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

U.S. Department Of Defense·Kansas

80% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026

City of Casper·Wyoming

80% match

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

City of Clearwater·Florida

80% match

Lower Spring Branch Stormwater Improvements

Closes 12/9/2026Opened 9/30/2026

Georgia City of Roswell·Georgia

80% match

Big Creek Demolition project

Closes 11/23/2026Opened 10/27/2026

Georgia City of Johns Creek·Georgia

80% match

Town Center Streetscape

Closes 11/10/2026Opened 10/12/2026

U.S. Department Of The Interior·Colorado

80% match

GCI Pollyanna #2 Acid Mine Drainage Remediation Pr

Closes 11/6/2026Opened 9/30/2026

Massachusetts Town of Brewster·Massachusetts

80% match

Culvert & Bank Stabilization work

Closes 11/5/2026Opened 9/23/2026

Town of Prosper·Texas

80% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

80% match

Foxrun/Burtonwood Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/29/2028

U.S. Department Of The Interior·Colorado

80% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

City of Colorado Springs·Colorado

80% match

Parks On-Call Irrigation Repairs

Closes 12/2/2026Opened 10/27/2026

City of Tuscaloosa CFG·Alabama

80% match

Alberta Landscape Project

Closes 12/3/2026Opened 10/30/2026