Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Roof Replacement for LSC Cy-Fair Arts Building

Lone Star College·Texas

Roof Replacement for LSC Cy-Fair Arts Building

Closes 6/9/2026$2M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lone Star College System is seeking a contractor to replace the existing gravel-surfaced built-up roof system at the LSC CyFair Arts Center. The project includes the removal of the existing roofing materials, repair of the existing substrate, and installation of a new watertight modified bitumen roofing system. The contractor will be responsible for all labor, materials, equipment, and supervision necessary for the project. The key requirements of the project include: • Removing the existing roofing materials down to the lightweight insulating concrete (LWIC) deck • Repairing the existing substrate • Installing a new watertight modified bitumen roofing system • Coordinating, permitting, inspections, and final closeout documentation • Providing a 20-year manufacturer’s full-system warranty covering materials and labor • Providing a 2-year contractor workmanship warranty covering installation, sealants, and related work The contractor must also comply with all applicable laws, regulations, and codes, including the Texas Education Code, Texas Government Code, and the Federal Water Pollution Control Act. Some of the key evaluation criteria for this project include: • Price • Relevant experience, qualifications, reputation, and quality • Schedule • Safety record and program • Financial capability The contractor must also provide a surety letter and comply with all requirements outlined in the solicitation document. • Project scope and overview • Non-disruption of campus/building operations • Project management and pre-construction • Demolition and substrate preparation • Roofing system installation • Finishing and cleanup

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lydia Sterling(Senior Commodity Manager)

[email protected]

Key dates

Opened
5/1/2026
Questions due
5/18/2026
Pre-bid meeting
5/6/2026Mandatory
Site visit
5/6/2026Mandatory
Closes
6/9/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238160
Solicitation №
CSP 26-03-13 Addendum 5

Budget estimate

$2,000,000 – $3,000,000

The estimated budget for this project is $2,187,500.00. Based on this information, it can be inferred that the budget for this project will be around $2 million to $3 million, considering the scope of work and the requirements outlined in the solicitation document. The actual budget may vary depending on the contractor's bid and the final contract agreement. Factors that may influence the likely payment range include: - The complexity of the project, including the removal of existing roofing materials and the installation of a new roofing system - The need for specialized labor and equipment, such as cranes and scaffolding - The requirement for compliance with applicable laws, regulations, and codes - The need for coordination with other contractors and stakeholders, such as the building owner and occupants Overall, the budget for this project is expected to be significant, reflecting the scope and complexity of the work required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

University of South Carolina·South Carolina

Top match · 69%

USC Lancaster MR&R - Roof Replacements Medford Lib

Closes 11/10/2026Opened 10/10/2026

University of South Carolina·South Carolina

68% match

USC Lancaster MR&R - Roof Replacements Medford Lib Rep

Closes 11/10/2026Opened 10/12/2026

University of South Carolina·South Carolina

68% match

Re-advertise-USC Lancaster MR&R - Roof Replacements Medford Lib Rep

Closes 11/10/2026Opened 10/19/2026

City of Ontario·California

68% match

FM26-001 Chaffey Community Museum of Art Roof Replacement

Closes 11/10/2026Opened 10/8/2026

Massachusetts Yarmouth Housing Authority·Massachusetts

67% match

Roof Replacement - Community Building

Closes 11/12/2026Opened 10/28/2026

67% match

Liberty High

Closes undefinedOpened

Collin County Community College District·Texas

67% match

Frisco Library Roof Replacement

Closes 11/13/2026Opened 10/16/2026

NYS Cornell University·New York

67% match

Replace Roofs - Various Buildings

Closes 11/3/2026Opened 10/8/2026

Michigan Board of Education for Mason Consolidated Schools·Michigan

67% match

Middle School Roof Replacement

Closes 11/11/2026Opened 10/21/2026

Michigan L’Anse Creuse Public Schools Board of Education·Michigan

66% match

Roofing Replacement Bid

Closes 11/5/2026Opened 10/9/2026

City of San Diego·California

66% match

San Diego Convention Center West Roof Replacement

Closes 11/4/2026Opened 9/30/2026

Michigan Detroit Public Schools Community District·Michigan

66% match

27-0052 FMP Series 6 Roof Replacement for Cass Tech, Emerson

Closes 11/13/2026Opened 10/29/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

66% match

Roof Replacement - DCF Gloucester Regional School

Closes 12/8/2026Opened 10/26/2026

City of Alhambra·California

66% match

ROOF REPLACEMENT - Fire Station 73

Closes 12/3/2026Opened 10/21/2026

Massachusetts City of Cambridge·Massachusetts

66% match

COC-CIFB-FY27-31196: 689 Mass Ave Roofing Replacement

Closes 11/5/2026Opened 9/17/2026

Michigan Taylor School District·Michigan

66% match

The Roof Removal and Replacement at the Taylor Career Center

Closes 11/12/2026Opened 10/16/2026