The project involves the replacement of earthen drainage ditches with underground concrete box culverts in the Village of East Hazel Crest, Cook County, Illinois. The base work includes the installation of 586 linear feet of 6’x2’ concrete box culvert, and option work includes installing 171 linear feet of 6’x2’ concrete box culvert. The project is restricted to small business concerns, and the magnitude of cost for construction is estimated between $1,000,000 and $5,000,000. The requirement is for one year.
• The project requires the replacement of earthen drainage ditches with underground concrete box culverts.
• The base work includes the installation of 586 linear feet of 6’x2’ concrete box culvert.
• Option work includes installing 171 linear feet of 6’x2’ concrete box culvert.
• The project is restricted to small business concerns.
• The magnitude of cost for construction is estimated between $1,000,000 and $5,000,000.
• The requirement is for one year.