Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›BOWL ASSEMBLY

U.S. Department Of Defense·Pennsylvania

BOWL ASSEMBLY

Closes 3/6/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Navy is seeking a contractor to repair BOWL ASSEMBLY items. The contractor must meet the required Repair Turnaround Time (RTAT) of 38 days. The Government intends to add an option quantity to the resultant contract, and the contractor may be required to provide a price reduction if they do not meet the RTAT. The contractor must also comply with the terms and conditions of the Basic Ordering Agreement (BOA) and provide proof of being an authorized distributor of the original manufacturer's item. Some key points to consider: • The contractor must meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed in the contract. • The contractor must perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. • The contractor must provide a quote that includes the unit price, total price, and Repair Turnaround Time (RTAT). • The contractor must comply with the terms and conditions of the contract, including the quality assurance and packaging requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sophie E. Benson

SOPHIE.E.BENSON.CIV@US.NAVY.MIL

(717) 605-6829

Key dates

Opened
2/27/2026
Closes
3/6/2026
Duration
38 days

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
333998
Solicitation №
N0010426QJA98

Budget estimate

$100,000 – $500,000

The budget for this opportunity is likely to be in the range of $100,000 to $500,000. This estimate is based on the fact that the opportunity involves the repair of BOWL ASSEMBLY items, which is a relatively complex process that requires specialized equipment and labor. The budget will depend on the number of items repaired and the complexity of the repairs. The contractor will need to provide a quote that includes the unit price, total price, and Repair Turnaround Time (RTAT), and the Government will evaluate the quotes based on factors such as price, quality, and delivery time.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 56%

FEEDER ASSEMBLY

Closes 11/13/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

56% match

MODULE ASSEMBLY,RIM

Closes 2/12/2027Opened 10/29/2026

U.S. Department Of Defense·United States of America

56% match

VALVE ASSEMBLY

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

55% match

VALVE,BALL

Closes 11/2/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

55% match

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

U.S. Department Of Defense·United States of America

55% match

FD2030-26-01596

Closes 3/17/2027Opened 3/17/2026

U.S. Department Of Defense·United States of America

55% match

47--PIPE ASSEMBLY,METAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Pennsylvania

54% match

60--CABLE ASSEMBLY,FIBE

Closes 11/25/2026Opened 8/27/2026

U.S. Department Of Defense·United States of America

54% match

FD2020-22-00413-00

Closes 1/19/2027Opened 1/20/2022

U.S. Department Of Defense·United States of America

54% match

FD2030-24-00327-02

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Defense·United States of America

54% match

DROP BAR ASSEMBLY

Closes 1/19/2027Opened 10/21/2026

U.S. Department Of Defense·California

54% match

47--TUBE ASSEMBLY,METAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

54% match

47--TUBE ASSEMBLY,METAL

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

54% match

Hose Assembly, Nonmetallic

Closes 11/2/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

54% match

61--CABLE ASSEMBLY,SPECIAL

Closes 11/5/2026Opened 10/22/2026

City of Las Cruces·New Mexico

54% match

El Caldito Soup Kitchen

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

54% match

48--VALVE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

53% match

VALVE ASSEMBLY

Closes 12/4/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

53% match

28--DUCT ASSEMBLY

Closes 11/3/2026Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

53% match

58--RF MODULE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

53% match

NOZZLE ASSEMBLY

Closes 11/4/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

53% match

VALVE ASSEMBLY

Closes 12/4/2026Opened 9/25/2026

U.S. Department Of Defense·California

53% match

59--CIRCUIT CARD ASSEMBLY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

53% match

VALVE ASSEMBLY

Closes 11/27/2026Opened 10/28/2026

State University of New York (SUNY)·New York

53% match

Replace Select Catch Basins

Closes 11/10/2026Opened 10/15/2026