Beech Road Improvements is a comprehensive roadway reconstruction project in Licking County, Ohio, covering approximately 6,000 ft of Beech Road. The scope includes demolition of existing pavement, full-depth excavation, subgrade stabilization, installation of new asphalt and concrete layers, utility relocations, storm‑drain upgrades, traffic‑signal modifications, lighting, landscaping, and extensive erosion‑control measures. The City of New Albany is seeking qualified contractors to deliver the complete construction package under a lump‑sum contract with an engineer’s estimate of $13 million.
• Roadway reconstruction: clearing, grubbing, excavation, embankment, granular base, geogrid, cement‑stabilized subgrade, and multi‑layer asphalt paving.
• Utility work: relocation of fire hydrants, water valves, catch‑basins, and installation of new storm‑pipe and conduit.
• Traffic control & signal work: MOT detours, new signal heads, controllers, and signage.
• Lighting and landscaping: decorative LED luminaires, tree planting, seeding, mulching, and erosion‑control installations.
• Required compliance: ODOT specifications, environmental permits, and detailed quantity‑take‑offs provided in the addenda.