This project calls for a comprehensive rehabilitation of the Old Seward Highway corridor between International Airport Road and Tudor Road (Phase 2) in Anchorage, AK. The work includes removal and replacement of existing pavement, sidewalks, curb‑ramps, storm‑drain infrastructure, and traffic‑signal upgrades, along with extensive environmental mitigation such as stream‑bank restoration and contaminated‑soil handling. The contract will be awarded on a fixed‑price basis; bids are submitted on paper, and the successful contractor must complete the work within a 150‑day window after notice‑to‑proceed.
• Roadway scope: 6,647 sq yds of asphalt removal, 338 sq yds of sidewalk removal, new PCC curbs, colored concrete, and traffic‑marking installations.
• Storm‑drain scope: replacement of manholes, catch‑basins, installation of an oil‑and‑grit separator, and placement of 29 ton of rip‑rap plus 5,014 sf of insulation board.
• Electrical/traffic‑signal scope: installation of luminaire poles, conduits, signal heads, and heat‑trace systems.
• Environmental requirements: USACE Nationwide Permit 43, Fish‑Habitat Permit, flood‑hazard permit, and an extensive SWPPP.
• Schedule: Pre‑bid conference 10/14/2026, questions due 10/15/2026, bid opening 11/05/2026, NTP #2 around 05/01/2027, 120 days to substantial completion, total contract period 150 days.