This project is being procured by invitation only. DASNY has selected Vernon Construction & Development LLC as one of the general contractors to participate in this procurement process, and we are extending an invitation to your firm to bid with Vernon on the following project:
Project Name: Rathaus Hall 2nd Floor Renovation and Associated Asbestos Abatement (PLA/Union)
Owner: Dormitory Authority – State of New York (“DASNY”) — Project No. 380290
Architect/Engineer: Calvert Wright Architecture PC | Spatial Discipline
Project Description: The Project is the renovation of the second floor of Rathaus Hall at Queens College — approximately 14,000 SF — for the Department of Drama, Theatre and Dance, with associated work at the facade, roof, cellar and first floor. Scope includes asbestos abatement and removal of regulated building materials; removal and replacement of all existing windows; concrete eave patching and repair; replacement of deteriorated brick veneer; new rooftop HVAC equipment on new structural steel dunnage; and full interior fit-out of three studio classrooms with sprung dance flooring, two lab-style classrooms (design lab and costume shop), a classroom, a seminar/conference room, a student lounge, offices and corridors. Interior work includes VRF heat-pump HVAC, new controls to the existing perimeter steam heating, lighting and electrical upgrades, telecommunications, audiovisual and security systems, minor plumbing, and new architectural finishes, millwork and signage.
Project Labor Agreement: The successful low bidder, as condition of being awarded this Contract, will be required to execute the PLA. All subcontractors of every tier will be required to agree to be bound by the PLA.
Subcontractor Bid Due Date: Friday September 4, 2026 at 5PM
Link to Public Planroom: https://app.buildingconnected.com/public/61529488b2270100b4c94401
Vernon Construction & Development LLC is seeking proposals from qualified MWBE & SDVOB subcontractors & suppliers for the following trades:
Specifications Table of Contents
DIVISION 01 – GENERAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
DIVISION 08 – OPENINGS
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
DIVISION 26 – ELECTRICAL
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
For further information regarding this procurement and access to bid documents, please contact Arnold Elsner or Alexander Huerta at
[email protected];
[email protected] or via phone at 212-421-2000 ext. 1.
Thank you in advance for your interest, time, and efforts.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 18.00%
WBE Goal: 12.00%