The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of a 10-foot sidepath along Fordham Boulevard, which is approximately 1,800 linear feet, and the upgrade of the existing sidepath from Cleland Drive to Ridgefield Road, which is approximately 1,700 linear feet. The project requires clearing and grubbing, grading, concrete paving, drainage, erosion control, curb and gutter installation, signing, striping, and streambank stabilization. Based on industry standards, the cost of constructing a sidepath can range from $50 to $200 per linear foot, depending on the complexity of the project and the materials used. Assuming an average cost of $100 per linear foot, the total cost of the project can be estimated as follows: 1,800 linear feet x $100 per linear foot = $180,000 1,700 linear feet x $100 per linear foot = $170,000 Total estimated cost = $350,000 However, this is a rough estimate and the actual cost of the project may vary depending on various factors, such as the complexity of the project, the materials used, and the labor costs. Therefore, the budget for this project can be estimated to be in the range of $300,000 to $500,000.