The project involves the refurbishment of two existing hydraulic elevators (P-5 and P-6) in the D-Wing of the Fayetteville VA Medical Center. The work includes modernization, installation, commissioning, and turnover of the elevators while maintaining hospital operations and life-safety. The project requires the contractor to provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary for the work. The scope of work includes demolition of legacy systems, installation of non-proprietary modernization components, machine-room and pit code upgrades, cab and hoistway door refurbishments, and commissioning. The project is expected to last 445 days.
• The contractor shall provide a detailed baseline schedule for VA approval, reflecting all phases of work, milestones, inspections, and commissioning activities.
• The contractor shall furnish, install, test, and commission work in full compliance with applicable codes and standards, including ASME A17.1, NFPA 70, and VA directives.
• The contractor shall provide staff training and furnish all manuals and tools necessary for the operation and maintenance of the elevators.