Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Delaware guideDelaware Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Delaware
  4. ›Construction
  5. ›New Forensic Science Building at The Bissell Campus

State of Delaware OMB·Delaware

New Forensic Science Building at The Bissell Campus

Closes 5/7/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of Delaware seeks a qualified Construction Management (CM) firm to serve as CM‑as‑Agent for the New Forensic Science Building on the Bissell Campus. The CM will provide pre‑construction services (cost estimating, bid package development, solicitation management) and construction‑phase oversight for a 100,000‑115,000 sf forensic‑science facility that includes new laboratory space, renovation of historic hospital structures, and extensive utility and security upgrades. The solicitation is open now, with electronic submission due May 7 2026 and hard‑copy submission due May 11 2026. The project’s design is scheduled for completion in Fall 2026, with construction slated to begin in Spring 2027. • Scope includes construction‑management of demolition, abatement, new lab addition, historic building restoration, utility connections, and phased construction coordination. • Required qualifications: recent (≤ 5 yr) experience on forensic‑science or similar high‑security facilities, demonstrated capability on projects of comparable size and complexity, and ability to organize a multidisciplinary team. • Deliverables: detailed work plan, organizational chart with resumes, experience narratives (up to five projects), and an appendix of supporting materials; no financial‐capacity documentation required.

Attached files

Contact

Edwin Robles(Chief of Engineering and Operations)

[email protected]

Key dates

Opened
4/15/2026
Questions due
4/29/2026
Closes
5/7/2026

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
236220
Solicitation №
OMB-MJ4501000001

Budget estimate

$500,000 – $2,000,000

No contract value is disclosed. Based on typical construction costs for a 100k‑115k sf institutional laboratory (average $180‑250 per sf), total construction could range from $18 M to $29 M. Construction‑management fees for CM‑as‑Agent arrangements typically run 4‑8 % of construction cost, suggesting a possible fee between $720 k and $2.3 M. Allowing for additional pre‑construction services and potential fee adjustments, a reasonable estimate for the firm’s earnings is roughly $0.5 M to $2 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The University of North Carolina·North Carolina

Top match · 65%

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

Hennepin County·Minnesota

62% match

Forensic Science Lab Operational Space Assessment

Closes 12/1/2026Opened 10/20/2026

North Carolina State University·North Carolina

62% match

NC State University

Closes 11/4/2026Opened 10/6/2026

North Carolina Robeson Community College·North Carolina

61% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

Pasco County Sheriff·Florida

61% match

PSO’s F1RST Forensics Building Drywall, Insulation, and Suspended Acoustical Ceiling Installation

Closes 11/17/2026Opened 10/16/2026

North Carolina State University·North Carolina

61% match

NC State University

Closes 11/4/2026Opened 10/6/2026

Iowa State University·Iowa

60% match

CP1321285‑Reiman Gardens Storage Building and Maintenance Building Addition

Closes 11/5/2026Opened 10/8/2026

State University of New York (SUNY)·New York

59% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

North Carolina School of Science and Mathematics·North Carolina

59% match

NC School of Science and Math

Closes 11/17/2026Opened 10/26/2026

York Technical College·South Carolina

59% match

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

Clemson University·South Carolina

59% match

Johnstone Site Housing

Closes 11/18/2026Opened 10/22/2026

NYS Buffalo Board of Education·New York

58% match

BUILDING CONDITIONS SURVEY

Closes 11/13/2026Opened 10/22/2026

York Technical College·South Carolina

58% match

YTC - Welding Expansion - Building D

Closes 11/12/2026Opened 10/9/2026

Connecticut City of Bristol·Connecticut

58% match

Architectural Services for Food Science Lab Improvements

Closes 11/19/2026Opened 10/30/2026

University of North Dakota·North Dakota

58% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

Northeastern Illinois University·Illinois

58% match

Invitation for Construction Bid: Integrated Bioprocessing Research Laboratory Add

Closes 11/4/2026Opened 10/1/2026

Horry Georgetown Technical College·South Carolina

58% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

Grayson College·Texas

58% match

Grayson College - New Maintenance Facility & Existing Health Science Renovations

Closes 11/5/2026Opened 10/9/2026

University of South Carolina·South Carolina

58% match

Comprehensive Data Management System

Closes 11/24/2026Opened 10/9/2026

Fashion Institute of Technology·New York

58% match

IFB C1762 - Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

Ferris State University·Michigan

58% match

Birkam Health Center & Johnson Hall Relocation; Professional Pre-Construction & Construction Management Services

Closes 11/12/2026Opened 10/20/2026

Dillon School District Four·South Carolina

57% match

Dillon School District Four Storage Building

Closes 11/12/2026Opened 10/14/2026

CUNY Baruch College·New York

57% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

The University of North Carolina·North Carolina

57% match

Experiential Learning Center – James B. Hunt Jr. Library

Closes 11/4/2026Opened 10/6/2026

Connecticut Albertus Magnus College·Connecticut

57% match

Albertus Magnus College, Ralph Walker Rink – Women’s Locker Room

Closes 11/12/2026Opened 10/27/2026