Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›56 CS FOC to Flightline and Wx Equipment, Luke AFB

U.S. Department Of Defense·Arizona

56 CS FOC to Flightline and Wx Equipment, Luke AFB

Closes 11/9/2026$5M – $15MRequest for Quotation
Get bids like this by emailBid source

Description

The contract calls for the engineering, furnishing, installation, and testing of a new 12‑strand single‑mode fiber‑optic cable system that will interconnect multiple air‑traffic‑control and weather‑monitoring facilities at Luke Air Force Base. Work includes using existing ductwork where available, installing new hand‑holes and conduit, direct‑buried sections, splicing, termination in fiber‑optic distribution panels, and delivering as‑built drawings and geospatial data. The contractor must provide all materials, labor, equipment, permits, safety plans, and warranty coverage, and must comply with Air Force, Buy‑American, and environmental requirements. • Install ~30,000 ft of 12‑strand SM fiber linking RAPCON, ATCT, Base Ops, CP, Localizer, Glide‑Slope, TACAN, GATR, and weather stations (FMQ‑19). • Provide 13 new Fiber‑Optic Distribution Panels, network cabinets, back‑boards, and associated grounding/termination hardware. • Perform OTDR and power‑meter testing, submit weekly progress reports, QA reports, and final as‑built/geospatial deliverables within a 180‑day period of performance.

Attached files

Contact

Rachel Tilley(Contracting Officer)

[email protected]

Key dates

Opened
10/7/2026
Questions due
10/19/2026
Site visit
11/4/2026
Closes
11/9/2026
Duration
180 days

Last updated

Details

Type
Request for Quotation
Industry
Telecommunications
NAICS
335921
Solicitation №
F3YCFA6173AC01

Budget estimate

$5,000,000 – $15,000,000

There is no contract value disclosed. Based on typical costs for installing 30,000 ft of single‑mode fiber (including materials, civil work, testing, and warranties) on a military base, a reasonable estimate ranges from $5 million for a low‑complexity, low‑margin bid to $15 million for a high‑spec, fully‑warrantied solution. Factors influencing the range include material choices (e.g., premium Corning cable), depth and complexity of direct‑buried work, and the extent of ancillary equipment (cabinets, distribution panels, back‑boards).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Utah

Top match · 82%

FD2020-22-00070

Closes 11/3/2026Opened 11/4/2021

U.S. Department Of Defense·Utah

82% match

FD2020-23-00041

Closes 10/26/2027Opened 10/27/2022

U.S. Department Of Defense·Utah

82% match

FD2020-22-00051

Closes 10/31/2026Opened 11/2/2021

U.S. Department Of Defense·Utah

81% match

FD2020-22-00379

Closes 12/15/2026Opened 12/16/2021

Oregon Northern Wasco County PUD·Oregon

81% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Utah

81% match

FD2020-22-00209

Closes 11/8/2026Opened 11/10/2021

U.S. Department Of Defense·Utah

81% match

FD2020-22-00247

Closes 11/20/2026Opened 11/22/2021

U.S. Department Of Defense·Utah

81% match

FD2020-23-00340

Closes 1/10/2028Opened 1/11/2023

U.S. Department Of Defense·Utah

81% match

FD2020-23-00068

Closes 2/13/2028Opened 2/14/2023

U.S. Department Of Defense·Utah

81% match

FD2020-22-00141

Closes 1/10/2027Opened 1/11/2022

U.S. Department Of Defense·Utah

81% match

FD2020-23-00055

Closes 10/31/2027Opened 11/1/2022

Utility Board of the City of Key West·Florida

81% match

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026

U.S. Department Of Defense·Utah

81% match

FD2020-23-00271

Closes 1/25/2028Opened 1/26/2023

U.S. Department Of Defense·Utah

80% match

FD2020-22-00069

Closes 11/2/2026Opened 11/4/2021

U.S. Department Of Defense·Utah

80% match

FD2020-22-00068

Closes 11/14/2026Opened 11/16/2021

U.S. Department Of Defense·Utah

80% match

FD2020-22-00052

Closes 11/1/2026Opened 2/22/2022

U.S. Department Of Defense·Utah

80% match

FD2020-23-00303

Closes 2/6/2028Opened 2/7/2023

U.S. Department Of Defense·Utah

80% match

FD2020-22-00073

Closes 11/4/2026Opened 11/4/2021

U.S. Department Of Defense·Utah

80% match

FD2020-22-00140

Closes 11/9/2026Opened 11/10/2021

U.S. Department Of Defense·United States of America

80% match

60--CABLE,FIBER OPTIC

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Utah

80% match

FD2020-22-00218

Closes 1/3/2027Opened 1/4/2022

U.S. Department Of Defense·Utah

80% match

FD2020-22-00041

Closes 1/18/2027Opened 1/19/2022

U.S. Department Of Defense·Utah

80% match

FD2020-23-00297

Closes 1/10/2028Opened 1/11/2023

U.S. Department Of Defense·United States of America

80% match

FD2020-22-00603-00

Closes 3/14/2027Opened 3/15/2022

U.S. Department Of Defense·Utah

80% match

FD2020-22-00034

Closes 11/16/2026Opened 11/17/2021