The U.S. Embassy, New Delhi has a requirement to renovate and reconfigure the existing Bath House and Pump Room facility into a modern Public Toilet Facility. The project includes demolition of existing internal partitions, toilets, showers, plumbing fixtures, piping systems, electrical fixtures, floor finishes, wall finishes, doors, and associated building components. The contractor shall provide all labor, materials, supervision, tools, equipment, transportation, testing, permits, consumables, and incidentals necessary to complete the project. The scope of work includes mobilization and site preparation, demolition and removal works, architectural works, plumbing works, underground sewer infrastructure, electrical works, and ventilation works.
• The existing facility consists of toilet rooms, shower areas, wash basin areas, and pump room space.
• The project includes installation of new underground sanitary sewer piping, construction of four new sewer manholes in the lawn area adjacent to the facility, and extension of sewer connections to the existing main sewer manhole located near the Embassy boundary wall.
• The contractor shall provide a qualified Project Manager who shall remain responsible for daily coordination with the COR throughout the duration of the project.
• The contractor shall submit a detailed work schedule, safety plan, Activity Hazard Analysis (AHA), and material submittals for review and approval before commencing work.