The U.S. Coast Guard, Surface Forces Logistics Center, is seeking sources capable of providing dockside repairs to the USCGC LEGARE (WMEC-912), a 270-foot Medium Endurance Cutter. The work will include various tasks such as load testing, inspecting and testing circuit breakers, removing and reinstalling windspeed transmitters, calibrating flow meters, and preserving decks. The anticipated period of performance is 75 calendar days, starting on June 1, 2026, and ending on August 14, 2026.
Key tasks and requirements include:
• 28 Volt DC Helo Power Supply, Load Test
• 400 Hz Power Supply (FCX Systems Inc), Load Test
• Circuit Breakers (400 HZ), Inspect and Test
• Windspeed Transmitter, Anemometer, Remove and Reinstall
• Flow Meter (Aviation Fuel), Calibrate
• Commissary Hoist, Inspect and Service
• Helo Talon Grids, Inspect and Test
• Decks, Helicopter Operating Areas, Preserve
• Helicopter Tie-Down Fittings, Renew (OPTION ITEM)
• Anchor Chain, Renew – (OPTION ITEM)