Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›IN NP INDU PMS(1), Pavement Preservation Indiana Dunes

U.S. Department Of Transportation·Washington

IN NP INDU PMS(1), Pavement Preservation Indiana Dunes

Closes 1/16/2026$5M – $10MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves pavement preservation work in Indiana Dunes National Park, with a total length of 5.96 miles for the base schedule and additional miles for options X, Y, and Z. The work includes micro surfacing, asphalt pavement crack and joint sealing and filling, and asphalt pavement patching. The contractor must provide labor, equipment, and materials to complete the work. The project has a completion date of 07/24/2026, and the contractor must commence work within 10 calendar days after receiving the notice to proceed. The project is governed by the Federal Acquisition Regulation (FAR) and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. Some key features of the project include: • Micro surfacing work with specific application rates and aggregate gradations • Asphalt pavement crack and joint sealing and filling with pre-formulated mastic materials • Asphalt pavement patching with fog seal application • Temporary traffic control, including construction signs, flaggers, and portable traffic barriers • Permanent pavement markings, including epoxy pavement markings and glass beads The contractor must submit a proposal, including a completed SF 1442, bid schedule, and representations and certifications. The proposal must be submitted in a sealed envelope with the solicitation number and project name on the outside.

Attached files

Contact

[email protected]

(360) 619-7520

Key dates

Opened
8/22/2025
Closes
1/16/2026
Duration
225 days, based on the completion date of 07/24/2026 and the notice to proceed date of 03/16/2026, assuming a 10-day commencement period.

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237310
Solicitation №
69056725R000016

Budget estimate

$5,000,000 – $10,000,000

The estimated price range of the project work is between $5,000,000 and $10,000,000, as stated in the Notice to Offeror section. This estimate is based on the scope of work, which includes micro surfacing, asphalt pavement crack and joint sealing and filling, and asphalt pavement patching. The actual budget may vary depending on the contractor's bid and the final scope of work. Factors that may influence the likely payment range include the complexity of the work, the availability of materials and labor, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Washington

Top match · 73%

UT NP DINO PMS(1), Pavement Preservation DINO

Closes 7/13/2028Opened 7/13/2026

U.S. Department Of Transportation·Washington

72% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

U.S. Department Of Transportation·Utah

71% match

UT NP DINO PMS(1), Pavement Preservation DINO

Closes 7/13/2028Opened 7/20/2026

U.S. Department Of Transportation·New York

70% match

Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)

Closes 12/1/2026Opened 10/15/2026

U.S. Department Of Transportation·Washington

70% match

WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana

Closes 7/16/2028Opened 7/16/2026

City of Indianapolis·Indiana

69% match

Property Preservation Services

Closes 11/5/2026Opened 10/16/2026

U.S. Department Of Transportation·Pennsylvania

69% match

Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2)

Closes 12/8/2026Opened 10/22/2026

U.S. Department Of Transportation·Wyoming

69% match

WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana

Closes 7/16/2028Opened 7/20/2026

U.S. Department Of Transportation·Washington

68% match

CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove

Closes 8/13/2027Opened 8/13/2026

U.S. Department Of Transportation·California

67% match

CA NP KICA PMS(1), Pavement Preservation Kica Cedar Grove

Closes 8/13/2027Opened 8/13/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

67% match

AMLRP w/ PTS, State Game Lands 332, Indiana Cnty

Closes 11/12/2026Opened 10/16/2026

Town of Jupiter·Florida

67% match

Sims Creek Preserve

Closes 11/4/2026Opened 9/22/2026

Henrico County Government·Virginia

67% match

ITB No. 26-3010-10EAR - Annual Contract for Paver Laid Full Depth Reclamation

Closes 11/4/2026Opened 10/6/2026

Palm Beach County (Board of County Commissioners)·Florida

67% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/19/2026

Escambia County·Florida

67% match

Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF

Closes 11/3/2026Opened 9/21/2026

County of Maui·Hawaii

67% match

Furnishing of Pavement Preservation Products

Closes 11/10/2026Opened 10/22/2026

Lapeer County Road Commission·Michigan

66% match

2027 Lapeer Township Subdivision Paving

Closes 11/6/2026Opened 10/19/2026

Illinois THA - Toll Highway Authority·Illinois

66% match

RR-26-2069 Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/28/2026

City of Vernon·California

66% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Georgia Department of Transportation·Georgia

66% match

T32-D4-PavePRes-Coffee-SR268-193832

Closes 11/5/2026Opened 10/21/2026

Georgia Department of Transportation·Georgia

66% match

T32-D4-PavePres-ATCO-SR135-194366

Closes 11/12/2026Opened 10/28/2026

Nevada Government·Nevada

66% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Illinois Tollway·Illinois

66% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

Indiana University·Indiana

66% match

Turf Treatment Services for IU: Indianapolis, Bloomington, and Satellite Sites

Closes 11/6/2026Opened 10/19/2026