Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›Valve Replacement Project

Maryland Thomas B. Finan Hospital Center·Maryland

Valve Replacement Project

Closes 6/26/2026$50k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Thomas B. Finan Hospital Center is seeking a contractor to replace two 8-inch underground water main valves located in Loop Road. The project requires a complete and total domestic water outage to the TBFC campus and must be coordinated to minimize disruption to facility operations and water service. The scope of work includes pre-construction activities, traffic control and site protection, excavation and exposure, water service shutdown, valve removal and replacement, testing and flushing, backfill and roadway restoration, and site restoration and closeout. The contractor must provide all labor, materials, equipment, permits, and supervision necessary to complete the project. • The project involves replacing two 8-inch underground water main valves • The project requires a complete and total domestic water outage to the TBFC campus • The contractor must coordinate with facility personnel to minimize disruption to facility operations and water service • The project must comply with local utility, state, and OSHA requirements • The contractor must provide all labor, materials, equipment, permits, and supervision necessary to complete the project

Attached files

Contact

Christopher Benson(Procurement Officer)

[email protected]

Key dates

Opened
6/24/2026
Closes
6/26/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
BPM057692

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the scope of work, which includes replacing two 8-inch underground water main valves, excavation, and roadway restoration. The cost of materials, labor, and equipment for such a project can range from $50,000 to $200,000, depending on the complexity of the project, the location, and the contractor's rates. Factors that may influence the likely payment range include the cost of valves, excavation and backfilling, asphalt restoration, and labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Unified Government of Athens-Clarke County, GA·Georgia

Top match · 74%

BID #27021 Irrigation Valve Replacement at Holland Youth Sports Complex RE-BID

Closes 11/18/2026Opened 10/14/2026

City of Richland·Washington

74% match

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

Georgia Unified Government of Athens-Clarke County·Georgia

72% match

BID #27021 Irrigation Valve Replacement at Holland Youth Sports Complex RE-BID

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·California

72% match

16--VALVE,ECS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

Norton Housing Authority·Massachusetts

71% match

Tub Surround & Shower Valve Replacement REBID

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

71% match

STEM,FLUID VALVE

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

71% match

48--VALVE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

71% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 12/15/2026Opened 9/16/2026

U.S. Department Of Defense·United States of America

71% match

48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF

Closes 11/20/2026Opened 10/22/2026

City of Charlotte·North Carolina

70% match

McDowell Knife Gate Valve

Rolling / TBD closeOpened 11/15/2025

City of Charlotte·North Carolina

70% match

McDowell WWTP Headworks Improvements

Rolling / TBD closeOpened 6/1/2026

U.S. Department Of Defense·California

70% match

VALVE ASSEMBLY,ENVI

Closes 11/30/2026Opened 10/22/2026

Alabama Department of Veterans Affairs·Alabama

70% match

Nichols - Backflow Valve Replacement

Closes 11/3/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

70% match

VALVE ASSEMBLY,MANI

Closes 11/16/2026Opened 10/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

70% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

70% match

VALVE,LINEAR,DIRECT

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

70% match

48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF

Closes 12/1/2026Opened 10/17/2026

City of Redlands·California

70% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

70% match

VALVE,GLOBE

Closes 11/6/2026Opened 10/22/2026

Santa Clara Valley Water District·California

69% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

69% match

VALVE ASSEMBLY

Closes 11/2/2026Opened 10/28/2026

Washington Suburban Sanitary Commission·Maryland

69% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

69% match

VALVE ASSEMBLY

Closes 12/4/2026Opened 9/25/2026

U.S. Department Of Defense·United States of America

69% match

48--VALVE ASSEMBLY,MANI, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/8/2026

Bristol Virginia Utilities Authority·Virginia

69% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026