The Thomas B. Finan Hospital Center is seeking a contractor to replace existing concrete steps with a steel open-grate stair system. The project involves demolition and removal of the existing stairs, foundation modifications, fabrication and installation of steel stairs, handrails, and guardrails, corrosion protection, testing, and inspection. The contractor must provide all labor, materials, equipment, supervision, permits, and incidentals necessary to complete the project. The scope of work includes site investigation, demolition, foundation modifications, fabrication and installation of steel stairs, handrails, and guardrails, corrosion protection, testing, and inspection. Key considerations include compliance with OSHA and local building code requirements, heavy-duty commercial/industrial use, and minimizing disruption to loading dock operations.
• The project requires removal of existing concrete stairs and handrails
• The contractor must install a steel open-grate stair system with handrails on both sides
• The project involves foundation modifications, including excavation and installation of reinforced concrete foundations
• The contractor must provide corrosion protection for all structural steel, grating, fasteners, and railings
• The project requires testing and inspection to verify code compliance and safe operation