The City of Pensacola is soliciting bids for the design‑build construction of a 47‑acre stormwater park that will integrate comprehensive water‑management infrastructure with public recreational amenities. The scope encompasses demolition, site preparation, extensive earthwork, installation of stormwater conveyance systems, underground detention units, a pump station, and associated electrical/mechanical components, as well as park surfacing, landscaping, lighting, signage, and site furnishings. Coordination with the Florida Department of Transportation (FDOT) and CSX is required for works affecting transportation and rail right‑of‑way.
• Demolition, grading, erosion and sediment control for a 47‑acre site.
• Installation of new stormwater infrastructure (inlets, culverts, channels, detention facilities, StormCapture units).
• Construction of a pump station at Long Hollow Pond with full electrical, mechanical, and conveyance systems.
• Development of multipurpose recreational areas, park pavement, landscaping, irrigation, lighting, signage, benches, bike racks, water fountains, and other site furnishings.
• Coordination with FDOT and CSX for utility and right‑of‑way impacts; compliance with all applicable city, state, and federal specifications.