The City of Fresno is seeking bids for “Pave More Now” – Package B‑3, a multi‑site pavement rehabilitation project covering five street blocks. The work includes full‑depth asphalt grind and overlay, reconstruction of curb ramps and sidewalks, replacement of striping and advance stop bars, installation of traffic‑signal loops, and adjustments to water‑valve and manhole lids to match the new pavement grades. The contract has a total construction allocation of $6.45 million, a 120‑working‑day completion schedule, and carries a $1,000 per day liquidated‑damage penalty for delays. Bidders must provide a 10 % bid deposit, 100 % performance and payment bonds, and comply with California prevailing‑wage, community‑workforce, and local‑preference requirements. Submission is electronic via Planet Bids, with a pre‑bid conference on 21 Oct 2026 (optional) and a bid deadline of 3 Nov 2026 at 3 PM.
• Scope: asphalt grind & overlay, curb‑ramp & sidewalk reconstruction, striping, traffic‑signal loops, utility adjustments at five locations.
• Budget: $6.45 M; 10 % bid deposit; 5 % retainage; 100 % bonds required.
• Schedule: 120 working‑day completion; liquidated damages $1,000/day; pre‑bid conference 21 Oct 2026 (optional).
• Mandatory compliance: CA prevailing‑wage, Community Workforce Agreement (local‑hiring percentages), SWPPP/FDCP, ADA accessibility, traffic‑control plans, and insurance minimums.