Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Katella Ave & State College Blvd Rehabilitation Project

The City of Anaheim·California

Katella Ave & State College Blvd Rehabilitation Project

Closes in 4 days$5M – $10MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Anaheim is soliciting bids for the rehabilitation of Katella Avenue and State College Boulevard. The scope includes full removal and reconstruction of asphalt concrete pavement using rubberized asphalt, reconstruction of ADA access ramps, curb and gutter, sidewalks, utility pull‑boxes, striping, signage, and pavement markings. The project is covered by the City’s Community Workforce Agreement (CWA), requiring all bidders and subcontractors to be registered with the California Department of Industrial Relations and to sign a Letter of Assent to the CWA. Bids will be evaluated on a total base‑bid basis, with the lowest responsive bidder awarded the contract. The contract will incorporate the 2024 Standard Specifications for Public Works Construction, with numerous special provisions governing definitions, permits, right‑of‑way, labor compliance, bonding, insurance, and project documentation. No specific dates, budget, or award timeline are disclosed in the excerpt. • Remove existing asphalt and install rubberized asphalt pavement. • Reconstruct ADA ramps, curb, gutter, and sidewalks. • Replace/adjust utility pull‑boxes and perform related utility work. • Provide new striping, signage, and pavement markings. • Comply with the Community Workforce Agreement and DIR registration requirements. • Submit bid bonds, performance bonds, insurance certificates, and a Letter of Assent. • Follow City‑issued specifications, permits, and inspection procedures.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason To(Public Works – Design Services Section)

[email protected]

(714) 765-5176 Ext: 5805

Key dates

Opened
10/15/2026
Questions due
10/23/2026
Closes
11/5/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
RCP2025-23565

Budget estimate

$5,000,000 – $10,000,000

Based on typical municipal roadway rehabilitation projects of similar length (approximately 1–2 miles) in Southern California, total contract values commonly range from $5 million to $12 million, depending on pavement thickness, utility relocation complexity, and labor‑hour rates. Considering the inclusion of rubberized asphalt, ADA ramp reconstruction, and extensive utility work, a reasonable estimate for the award amount would be between $5 million and $10 million. Factors that could shift the range include the final length of roadway, unforeseen subsurface conditions, and any additional scope added through change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Pasadena·California

Top match · 85%

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

California Department of Transportation·California

85% match

Multi-asset, pavement rehab, & off-ramp widening at Artesia Blvd.

Closes 11/10/2026Opened 9/21/2026

San Bernardino County·California

84% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Laguna Hills·California

84% match

Citywide Pavement Rehabilitation, CIP 101-M

Closes 12/1/2026Opened 10/29/2026

City of Santa Ana·California

84% match

Industrial Street Repair Program (Wilshire & Wright)

Closes 11/18/2026Opened 10/30/2026

City of Pasadena·California

84% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Modesto, CA·California

83% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 11/3/2026Opened 9/1/2026

City of Fresno·California

83% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

City of Salinas·California

83% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

City of Culver City·California

83% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of San Antonio·Texas

83% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of San Antonio·Texas

83% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of Pacific Grove·California

83% match

NOTICE INVITING SEALED BIDS - FY 2025/2026 STREET REHABILITATION PROJECT DEL MONTE BLVD, 10TH ST, BEACON AVE

Closes 11/12/2026Opened 10/12/2026

San Bernardino County·California

83% match

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

City of Fresno·California

83% match

City of Fresno Pave More Now - Bid Package B-3

Closes 11/3/2026Opened 10/6/2026

City of Murfreesboro·Tennessee

82% match

ADA Improvements at Cannonsburgh Village

Closes 11/10/2026Opened 10/20/2026

City of Vernon·California

82% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

82% match

SALES TAX STREET AND ROAD REHABILITATION PROGRAM PROJECT 21-7 STREETS IN TARA, OXFORD PLACE, SHERWOOD FOREST BLVD, DARRYL DR, BARD, & OAK KNOLL CITY PARISH PROJECT NO. 25-AO-ST-0026

Closes 11/3/2026Opened 10/9/2026

LA Public Works Engineering Bureau·California

82% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Texas City of San Antonio·Texas

82% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

Texas City of San Antonio·Texas

82% match

2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of Corning·California

82% match

Yolo Street Rehabilitation Project

Closes 11/4/2026Opened 9/23/2026

Stanislaus Regional Housing Authority·California

82% match

Buena Vista Rehab

Closes 12/1/2026Opened 10/26/2026

City of Fresno·California

82% match

City of Fresno Pave More Now - Bid Package S-1.1

Closes 11/3/2026Opened 10/6/2026

Texas City of San Antonio·Texas

82% match

2027 Task Order Contract for Street Rehabilitation Package 10 Flatwork

Closes 12/8/2026Opened 10/30/2026