Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Civil Engineering
  5. ›DNR North Shore State Parks Accessibility Improve

Department of Natural Resources·Minnesota

DNR North Shore State Parks Accessibility Improve

Closes 3/19/2026$1.5M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Minnesota Department of Natural Resources (DNR) is seeking proposals from consulting engineering firms to provide professional services for accessibility improvements at Tettegouche and Grand Portage State Parks. The project includes reconstruction of roads, parking facilities, and trails, as well as installation of accessible campsites, vault toilets, and water spigots. The selected firm will be responsible for surveying, designing, and constructing the improvements, as well as providing construction inspection and contract administration services. The project is funded through the Get Out More state funding program and is expected to be completed by December 2027. • The project includes reconstruction of 2300 LF of up to 16 ft wide bituminous one-way road serving the campground. • Evaluate and design reconstruction and/or resurfacing options on 1,100 LF of campground road providing access to the one-way campground loop. • Accessible parking improvements at the current campground shower building. • Accessible route to campground shower building from accessible parking and accessible campsites. • Electrical improvements at 5 current electric serviced campsites with existing service breaks or functionality issues. • Up to 2 accessible vault toilet (supplied by DNR) installations. • 6-8 Accessible campsites (walk in, electric, and non-electric, 2 minimum per type). • 1 Accessible water spigot (design standard supplied by the DNR). • Full reconstruction of a 22-site trailhead bituminous parking facility to accessibility code, with associated stormwater improvements. • Full bituminous trail reconstruction of a 2300 ft, 8 ft wide trail. • Minor trail re-alignment of 200 to 300 ft of trail, with a maximum displacement from the existing centerline of 10 ft. • Accessible landings, resting areas, and benches. • Hydraulic design and placement of new minor hydraulic structures (less than 48” in diameter). • Hydraulic design and placement of new wooden box culvert. • Minor concrete improvements on existing curb and sidewalk to meet accessibility standards. • Design plans for installation of an owner-supplied vault toilet that meets accessibility standards. • Redesign and replacement of wooden step infrastructure at the end of the High Falls bituminous trail to the High Falls viewing platforms meeting current building code and standards.

Attached files

Contact

Julie Johansen(Contract Officer)

[email protected]

Key dates

Opened
2/19/2026
Closes
3/19/2026
Duration
22 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541310
Solicitation №
2000017916

Budget estimate

$1,500,000 – $3,000,000

The budget for this project is estimated to be between $1,500,000 and $3,000,000. This estimate is based on the scope of work, which includes reconstruction of roads, parking facilities, and trails, as well as installation of accessible campsites, vault toilets, and water spigots. The estimate also takes into account the fact that the project is funded through the Get Out More state funding program, which suggests that the project has a significant budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Top match · 65%

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Illinois DNR - Natural Resources·Illinois

64% match

DNR Washington County SRA - Install New Floating Docks

Closes 11/12/2026Opened 10/27/2026

State of Michigan·Michigan

64% match

751/22413.CTS; Bay City State Park Campground Improvements

Closes 11/11/2026Opened 10/16/2026

Connecticut Energy & Environmental Protection·Connecticut

63% match

Connecticut Partnerships in Parks Initiative Notice of Request for Information

Closes 11/22/2026Opened 8/20/2025

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

63% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Massachusetts Department of Conservation and Recreation·Massachusetts

63% match

DCR 892 Adaptive Recreation Service Providers

Closes 2/29/2028Opened 12/26/2022

City of Cleveland·Ohio

63% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

NYS Essex County·New York

63% match

Willsboro Bay Park Shoreline Access & Land Use Management Plan

Closes 11/18/2026Opened 10/28/2026

Maryland-National Capital Park and Planning Commission·Maryland

62% match

Cosca Regional Park Boat House Replacement, Site Accessibility, and Stormwater Improvements Design Build

Closes 1/6/2027Opened 10/28/2026

Maryland National Capital Park and Planning Commission·Maryland

62% match

Cosca Regional Park Boat House Replacement, Site Accessibility, and Stormwater Improvements Design Build

Closes 1/6/2027Opened 10/29/2026

California Grants·California

62% match

Division of Boating and Waterways Local Assistance Statewide Ramp Repair and Modification Grant Program FY27

Closes 2/1/2027Opened 8/13/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Minnesota Department of Natural Resources·Minnesota

62% match

Lake County State Parks Tree Planting

Closes 11/12/2026Opened 10/15/2026

U.S. National Park Service·United States of America

62% match

Regional Resource Condition Assessment

Rolling / TBD closeOpened 7/14/2016

U.S. National Park Service·United States of America

62% match

R Package Development and Data Certification for the National Park Service Units of the National Capital Region and the Northeast

Rolling / TBD closeOpened 7/14/2016

Camden County·New Jersey

61% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Mississippi Department of Finance and Administration·Mississippi

61% match

Road Improvements (GS# 633-003)

Closes 11/19/2026Opened 10/20/2026

State of Delaware NAT·Delaware

61% match

Ted Harvey Conservation Area Viewing Platforms

Closes 11/5/2026Opened 10/1/2026

Buildings & General Services·Vermont

61% match

Fort Dummer State Park Off Season Lot and Entrance Improvements

Closes 11/20/2026Opened 10/23/2026

Mississippi MS Department of Finance and Administration·Mississippi

61% match

Road Improvements – Trace State Park

Closes 11/19/2026Opened 10/20/2026

National Park Service·United States of America

61% match

National Park Service Request for Proposals for Three Historic Properties

Rolling / TBD closeOpened 8/4/2026

Palm Beach County (Board of County Commissioners)·Florida

61% match

PBC North County Shore Protection

Closes 11/18/2026Opened 10/19/2026

Environmental Conservation, NYS Department of·New York

61% match

Hudson River Estuary Grants for River Access Round 49

Closes 12/17/2026Opened 9/28/2026

U.S. Department Of Transportation·North Dakota

61% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

County of Dane·Wisconsin

61% match

Lake Accessibility & Stormwater Improvements - Babcock Park

Closes 11/17/2026Opened 9/29/2026