Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Construction
  5. ›Lewisburg Pike (SR-106) Sidewalk & Multi-Use Path

City of Franklin·Tennessee

Lewisburg Pike (SR-106) Sidewalk & Multi-Use Path

Closes 5/15/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Franklin, Tennessee, is seeking bids for the construction of a sidewalk and multi-use path on Lewisburg Pike (SR-106) from just north of Stewart Street to just east of Collins' Farm. The project includes the construction of an at-grade pedestrian crossing, multiple utility relocations, concrete curb and gutter, drainage, concrete flatwork, asphalt paving, temporary traffic control, erosion prevention and sediment control, permanent signage, and pavement markings and striping. The contractor will be required to conduct extensive coordination with impacted residents and businesses, maintain access to all residential driveways and private entrances, and provide clear signage directing customers and residents to open access points. The contractor must also comply with all requirements of the permits obtained by the City, including the TDOT Highway Entrance Permit, City of Franklin Grading Permit, TDEC Water Line Permit, and TDEC Sewer Line Permit. Key aspects of the project include: • Construction of a sidewalk and multi-use path on Lewisburg Pike (SR-106) • Multiple utility relocations • Concrete curb and gutter, drainage, concrete flatwork, asphalt paving • Temporary traffic control, erosion prevention and sediment control • Permanent signage, pavement markings and striping • Extensive coordination with impacted residents and businesses • Compliance with permit requirements

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Allison Davis(Project Manager)

[email protected]

(615) 550-6637

Key dates

Opened
4/17/2026
Questions due
5/8/2026
Closes
5/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Contract 2026-0180

Budget estimate

$500,000 – $2,000,000

The budget for this project is not explicitly stated in the document. However, based on the scope of the project, which includes the construction of a sidewalk and multi-use path, utility relocations, and traffic control, the budget is likely to be in the range of $500,000 to $2,000,000. This estimate is based on industry standards for similar projects and takes into account the complexity of the project, the materials and labor required, and the need for compliance with various permits and regulations. Factors that may influence the likely payment range include the contractor's experience and reputation, the availability of materials and labor, and the level of competition for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Harrisonburg·Virginia

Top match · 68%

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Maryland Carroll County Government - Procurement·Maryland

68% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

City of Charlotte·North Carolina

68% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Charlotte·North Carolina

68% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Missouri Department of Transportation·Missouri

65% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

65% match

SW District, City of Ozark, Construction of two multiuse trail projects

Closes 11/12/2026Opened 10/14/2026

City of Toledo·Ohio

65% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

City of Gainesville - Procurement Division·Florida

65% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

65% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Hampton·Virginia

65% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

65% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

Carroll County·Maryland

64% match

Eldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/22/2026

City of Cincinnati·Ohio

64% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

County of Fairfax·Virginia

64% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

County of DeKalb, GA·Georgia

64% match

Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months)

Closes 11/12/2026Opened 9/28/2026

Georgia City of Sandy Springs·Georgia

64% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Kearney·Missouri

64% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Virginia Department of Transportation·Virginia

64% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

City of Richmond Government·Virginia

63% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Fort Wayne·Indiana

63% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Louisburg·Kansas

63% match

Lewis-Young Park Improvements RFP

Closes 12/1/2026Opened 10/22/2026

Richland County·South Carolina

63% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

Town of Bluffton·South Carolina

63% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Charleston County·South Carolina

63% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Indianapolis·Indiana

63% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026