Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Construction
  5. ›REACTOR WE 2262D59G01 FS-83A LINE LRV

Southeastern Pennsylvania Transportation Authority·Pennsylvania

REACTOR WE 2262D59G01 FS-83A LINE LRV

Closes 9/9/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the complete rebuild and repair of a specific reactor line (WE 2262D59G01 FS-83A LINE LRV) for the SEPTA transit system, including coil and core replacement per SEPTA specifications and required incoming QA inspection and testing. The work must adhere to the detailed specifications S‑1683‑3, S‑1726, and drawing D‑2173, using the listed SEPTA stock number. The contractor will be responsible for all labor, materials, and testing required to bring the reactor line back to operational condition. • Rebuild/repair of reactor line per SEPTA spec S‑1683‑3 • Coil and/or core replacement per spec S‑1726 and drawing D‑2173 • Mandatory QA incoming inspection and testing as outlined in paragraph 3.3.1 & 3.3.3 of spec S‑1683‑3 • Use of SEPTA stock no. 4603491L01 for parts procurement • Submission deadline is 4:30 pm on September 9 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Rose Huddell

[email protected]

(215) 580-8147

Key dates

Opened
9/2/2026
Closes
9/9/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
811310
Solicitation №
ICA262380157

Budget estimate

$200,000 – $500,000

No contract value is disclosed. Based on typical costs for full‑scale reactor line rebuilds—including labor, specialized coil/core parts, QA testing, and compliance with strict specifications—the project could range from a few hundred thousand dollars to mid‑six figures. Factors influencing the final amount include part prices (stock number 4603491L01), labor rates for highly specialized technicians, and any additional testing or documentation requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Texas

Top match · 60%

15--LINER,FUEL CELL

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·Alabama

59% match

29--INJECTOR ASSEMBLY,FUEL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Utah

59% match

FD2020-22-00099

Closes 11/2/2026Opened 11/3/2021

U.S. Department Of Defense·United States of America

59% match

29--INJECTOR ASSEMBLY,FUEL

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

59% match

29--TANK,FUEL,ENGINE

Closes 11/11/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

59% match

P-8A Australian APY-10 Radar Regional Repair Facility

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

59% match

45--HEATER,THERMAL,RELE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

58% match

29--VALVE,FUEL PUMP

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

58% match

28--OUTBOARD ENGINE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

58% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/3/2026

U.S. Department Of Defense·United States of America

58% match

29--FUEL CONTROL,MAIN,T, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

Pittsburgh Regional Transit·Pennsylvania

58% match

B261180 (Refrigerants)

Closes 12/4/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

University of Wisconsin‑Madison·Wisconsin

58% match

Processing Environment for astatine-211 (At-211)

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

58% match

43--FILTER UNIT,FLUID,PRES

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

58% match

47--HOSE ASSEMBLY,METALLIC

Closes 11/1/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

58% match

62--LIGHT,MARKER,DISTRESS

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

17--ROLLER-AFT,ENGINE INST

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

58% match

Main fuel control

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

58% match

28--ENGINE BLOCK ASSEMBLY,

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

58% match

29--FUEL CONTROL,MAIN,T, IN REPAIR/MODIFICATION OF

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

58% match

43--LINER,COMPRESSOR

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

58% match

43--FILTER ELEMENT,FLUID

Closes 11/3/2026Opened 10/20/2026

University of Wisconsin Madison·Wisconsin

58% match

Titanium Stirred 2-Reactor System with Controls for 4 Reactors

Closes 11/3/2026Opened 10/22/2026

U.S. Department Of Energy·Idaho

58% match

RELAP5-3D 4.x: Thermal-Hydraulic Nuclear Reactor Analysis, Licensing Opportunity

Closes 11/1/2026Opened 9/16/2025