Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›CUNY Medgar Evers College – AB1 Domestic Hot Water System…

Dormitory Authority of the State of New York·New York

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (EOI: For Minority and Women-Owned Business Concerns only) 363180 / C1858

Closes 10/15/2026$2.8M – $3.1MRequest for Expression of InterestLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY See the Eligibility Requirements further down in this document. The scope of work includes the removal of two dual-fuel (gas and #2 fuel oil) domestic hot water tanks and associated valves, fittings, and appurtenances in the Academic Building 1 boiler room. The removal includes all the associated piping for the cold water, domestic water, hot water supply, gas, fuel oil, breeching, and drains. The removal of all electrical wiring and conduits from the equipment. The removal of three circulating pumps, an existing mixing valve, and associated piping. Partial removal of the existing shaft from the basement to the 6th floor to allow for the installation of 3” city water and domestic hot water piping. Remove a section of the existing roof to install new heat pumps and pipe penetrations. The new work includes the installation of new 15-ton air source heat pumps at the roof level and the installation of two new hot water heaters, including circulation pumps and associated aquastat, mixing valve, cold and hot water piping, and heat tracing, including but not limited to all Plumbing, electrical, architectural, structural, demolition and mechanical connections as shown in the bid documents. The estimated construction cost range is between $2,787,775.00 to $3,081,225.00. Project Labor Agreement The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Only those Expression of Interest packages in the hands of DASNY, from Minority and Women-Owned Business Concerns as defined under the Small Business Concerns Set Aside Program, in accordance with Article 8, Title 4A, 4B, and 4C of the Public Authorities Law of the State of New York, will be considered. Minority firms must be certified by Empire State Development – New York State Government (ESD). Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below: Project Manual Drawings General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents. The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows: Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45% Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6% Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid. Firms shall provide one (1) copy in PDF format of the EOI package via e-mail to [email protected]. Upon receipt, confirmation of delivery will be provided by email for each submission. If a firm does not receive confirmation of receipt, the EOI package shall be deemed not received. Firms are responsible for ensuring that confirmation of receipt is obtained and should follow up promptly if confirmation is not received. Instructions for Submission of the EOI Packages: Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with: A Cover Page that clearly identifies: The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company Profile Provide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certification. MWBE firms must be certified by the Empire State Development – New York State Government (ESD). Tab 2 –Experience Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project Schedules Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety Program Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety. Tab 5 – Résumés Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative. Tab 6 – Potential Subcontractors Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work. Tab 7 – Anticipated Workload Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification Rating Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding Capacity Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility Questionnaire Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Norberto Dolores(Field Representative)

[email protected]

(718) 421-2621

Key dates

Opened
9/16/2026
Closes
10/15/2026

Last updated

Details

Type
Request for Expression of Interest
Industry
Construction
NAICS
238220
Solicitation №
2139069

Budget estimate

$2,787,775 – $3,081,225

The solicitation explicitly states an estimated construction cost range of $2,787,775 to $3,081,225. Assuming the awarded contract will be close to the midpoint of this range and that the client would receive the full contract amount (no fee‑based subcontracting indicated), the expected budget falls within that $2.8 M‑$3.1 M window. Factors that could shift the final amount include change orders, scope adjustments, or performance incentives, but the baseline estimate is firmly anchored by the provided cost range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Dormitory Authority of the State of New York·New York

Top match · 84%

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

CUNY Baruch College·New York

79% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Dormitory Authority of the State of New York·New York

78% match

CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement

Closes 11/17/2026Opened 10/9/2026

Dormitory Authority of the State of New York·New York

78% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

NYS Boilermatic Welding Industries, Inc.·New York

75% match

CUNY BARUCH COLLEGE SOUTH CAMPUS BOILERS &ASBESTOS ABATEMENT

Closes 11/3/2026Opened 10/7/2026

Dormitory Authority of the State of New York (DASNY)·New York

74% match

MWBE & SDVOB Opportunities - Baruch College South Campus Boilers and Asbestos Abatement, Baruch College

Closes 11/2/2026Opened 10/5/2026

Dormitory Authority of the State of New York·New York

73% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/5/2026Opened 9/24/2026

Dormitory Authority of the State of New York·New York

73% match

CUNY Queens College Hot Water Storage Tank Replacement and Asbestos Abatement

Closes 11/17/2026Opened 10/9/2026

Research Foundation of The City University of New York·New York

73% match

College of Staten Island Campus-Wide Flood Mitigation

Closes 12/18/2026Opened 9/18/2026

NYS Rocon Corp.·New York

73% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/5/2026

New York City Department of Education·New York

72% match

B3446: Leasing of Multi-Functional Devices

Rolling / TBD closeOpened 9/17/2026

Connecticut UConn Health Center·Connecticut

72% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Technical College System of Georgia·Georgia

72% match

82000-RYDC Building Abatement

Closes 11/20/2026Opened 10/20/2026

Nassau BOCES·New York

71% match

26/27-055 Abatement & Disposal of Asbestos & Lead Materials

Closes 11/4/2026Opened 10/15/2026

Dormitory Authority of the State of New York·New York

71% match

CUNY York College Exterior Light & Perimeter Fence & Asbestos Abatement (Minority and Women-Owned Business Concerns only)

Closes 11/19/2026Opened 10/14/2026

Environmental Conservation, NYS Department of·New York

71% match

Environmental Education Internship Program - Friends of Rogers Environmental Education Center

Closes 11/18/2026Opened 10/27/2026

Technical College System of Georgia (TCSG)·Georgia

71% match

82000-RYDC Building Abatement

Closes 11/20/2026Opened 10/20/2026

New York City Department of Education·New York

71% match

B5986: Requirements Contract for Asbestos Hazard Emergency Response Act (AHERA) Management Plan and Laboratory Services

Closes 1/28/2027Opened 10/29/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

71% match

Shower Building Addition NYS Park Police Training Academy

Closes 11/5/2026Opened 9/30/2026

North Carolina Southwestern Community College·North Carolina

71% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

Dormitory Authority of the State of New York·New York

70% match

CUNY Queens College Central Chiller Plant High Pressure to Low Pressure Steam Conversion and Asbestos Abatement

Closes 11/10/2026Opened 10/9/2026

Massachusetts Chelsea Housing Authority·Massachusetts

70% match

Plumbing

Closes 11/18/2026Opened 10/8/2026

Dormitory Authority of the State of New York·New York

70% match

CUNY Baruch College Information & Technology Building 2nd, 3rd, & 4th Floor Library Renovation & Associated Asbestos Abatement

Closes 11/4/2026Opened 9/25/2026

New York City Department of Education·New York

70% match

B5752 - Asbestos Hazard Emergency Response Act (AHERA) Management Plan and Laboratory Services for Asbestos Bulk Sampling and Analysis

Rolling / TBD closeOpened 9/17/2026

University of Massachusetts System·Massachusetts

70% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026