Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›R-7276 Downtown Walkable Corners

City of Long Beach·California

R-7276 Downtown Walkable Corners

Closes 10/22/2026$8M – $12MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Long Beach is seeking bids for the “Downtown Walkable Corners” project (R‑7276), a large‑scale civil‑engineering effort that includes catch‑basin relocation, extensive storm‑drain pipe installation, concrete collar and transition structures, curb and sidewalk reconstruction, sign‑post replacement, and comprehensive landscaping/planting. The work spans multiple downtown intersections and requires coordination with the Los Angeles County Flood Control District, compliance with NPDES permits, and detailed inspection/maintenance of connector‑pipe screens. The contract will be awarded to the lowest responsible bidder and will run from late December 2026 through early May 2028. • Catch‑basin relocation and installation of new storm‑drain infrastructure (RCP, CPS, ARS units). • Concrete work: collars, transitions, curbs, sidewalks, and pavement replacement. • Sign‑post fabrication/installation and removal of existing signage, plus extensive landscaping, tree planting, and root‑barrier installation. • Required pre‑bid conference (mandatory virtual meeting) and strict environmental and permitting compliance (NPDES, survey‑monument perpetuation).

Attached files

Contact

Alireza Vatanshenas(Information Contact)

[email protected]

(562) 570‑5782

Key dates

Opened
10/2/2026
Pre-bid meeting
10/8/2026Mandatory
Closes
10/22/2026
Duration
16 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
PW-26-792

Budget estimate

$8,000,000 – $12,000,000

The solicitation does not disclose a total contract value, but the breadth of work—storm‑drain installation, extensive concrete work, sign‑post replacement, and large‑scale landscaping—suggests a multi‑million‑dollar project. Based on comparable downtown infrastructure projects in California, a realistic estimate ranges from roughly $8 million at the low end (minimal contingency) to $12 million at the high end (including full landscaping, permitting, and contingency).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fayetteville, Georgia·Georgia

Top match · 63%

RFQ PZ740-01: SR54/SR85 Downtown Traffic Engineering and Walkability Study

Closes 12/3/2026Opened 10/28/2026

City of Lowell·Arkansas

61% match

RFQ: Lowell Downtown Master Plan

Closes 11/20/2026Opened 10/25/2026

City of Shawnee·Kansas

61% match

Ordinance No. 3508

Closes 10/22/2030Opened 10/22/2024

City of Lowell·Arkansas

61% match

RFQ: Lowell Downtown Master Plan

Closes 11/20/2026Opened 10/18/2026

Town of Milton·Vermont

60% match

Downtown Core Mixed-Use Development

Closes 11/9/2026Opened 9/15/2026

Urban Redevelopment Authority of Pittsburgh·Pennsylvania

60% match

Pittsburgh Downtown Conversion Program

Rolling / TBD closeOpened 2/28/2023

City of Richmond·Virginia

60% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3479

Closes 1/16/2029Opened 1/16/2024

NYS East Fishkill, Town of·New York

60% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3489

Closes 6/4/2029Opened 6/4/2024

City of Rock Hill·South Carolina

59% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Sacramento·California

59% match

Envision Triangle Space

Closes 11/4/2026Opened 10/19/2026

City of Richmond Government·Virginia

59% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Mulvane·Kansas

59% match

Mulvane - Downtown ADA Improvements

Closes 11/18/2026Opened 10/22/2026

City of Coronado·California

59% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Sacramento·California

58% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

58% match

Traffic Circle at NW 52nd Ave. And NW 191st St.

Closes 12/9/2026Opened 10/30/2026

NYS Rochester, City of·New York

58% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Shawnee·Kansas

58% match

Ordinance No. 3482

Closes 1/30/2030Opened 1/30/2024

State University of New York (SUNY)·New York

58% match

Science Department Renovation

Closes 11/23/2026Opened 10/29/2026

City of Edmond·Oklahoma

58% match

Downtown Edmond Master Plan

Closes 2/1/2027Opened 10/23/2026

City of Shawnee·Kansas

58% match

Resolution No. 2046

Closes 9/3/2029Opened 9/3/2024

City of Rock Hill·South Carolina

58% match

Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Shawnee·Kansas

58% match

Ordinance No. 3514

Closes 1/13/2032Opened 1/13/2025

Minnesota Department of Transportation·Minnesota

58% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026