This opportunity is a traditional bid‑build construction project to install equipment and structural components for the Belt 3 Rail Loadout Modifications at Oakley St. Louis, LLC’s facility in St. Louis, MO. The scope includes demolition, new foundations, structural‑steel erection, platform and access construction, hopper and conveyor system modifications, mechanical and electrical relocation, and full commissioning. Contractors must be pre‑qualified with MoDOT, possess multiple‑crane lifting capability, demonstrate in‑house steel fabrication capacity, and field a workforce of at least 45 employees (25 on‑site). The bid is a lump‑sum price with a submission deadline of 27 August 2026, and the award is expected in early September.
• Demolition and modification of existing 800 TPH belt conveyor system and associated utilities.
• Installation of new steel bearing piles, reinforced‑concrete foundations, structural‑steel support tower, platforms, stairs, handrails, and a 425 cu ft gathering hopper.
• Mechanical rerouting of dust‑collection ductwork, UAN piping, and electrical conduit; comprehensive commissioning and documentation.
• Mandatory MoDOT pre‑qualification, multiple‑crane capability, in‑house fabrication, and compliance with prevailing‑wage (WD MO20260001) and E‑Verify requirements.