Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›SW District, City of Springfield, constructing a multi-use…

Missouri Department of Transportation·Missouri

SW District, City of Springfield, constructing a multi-use path along the south side of Sunset Street

Closes 9/3/2026$3.5M – $4.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Springfield is soliciting sealed‑bid proposals for two federally‑funded, combined “South Creek Greenway” projects that must be bid together. The scope includes constructing concrete sidewalks, ADA ramps, curb and gutter, a commercial driveway, signal upgrades, storm‑water improvements, and fiber‑optic extensions along Sunset Street and at the Sunset/Glenstone intersection. The work is civil‑construction heavy, requiring MoDOT qualification, OSHA 10‑hour safety training, and prevailing‑wage compliance. The combined bid will be evaluated on the lowest responsive and responsible total price. • Required bid for both CRP 5901(830) and CRP 5901(839) as a single package. • Concrete sidewalk (≈22,500 sf + 2,250 sf), curb‑gutter (≈1,060 lf), ADA ramps, commercial driveway, traffic‑signal and storm‑water upgrades. • Mandatory bid bond/security of 5 % of total bid; no second‑tier subcontracting allowed.

Attached files

Contact

Evan Bergmann(Primary Bidding Contact)

(417) 864-1969

Key dates

Opened
7/31/2026
Pre-bid meeting
8/20/2026
Closes
9/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Notice No. 2778 – South Creek Greenway

Budget estimate

$3,500,000 – $4,500,000

Based on typical unit costs for concrete sidewalk ($120‑$130 per square foot), curb‑gutter ($30‑$35 per linear foot), ADA ramps ($150‑$180 per square foot), commercial driveway ($80‑$90 per square foot), and additional signal, storm‑water, and fiber‑optic improvements, the combined scope (≈24,750 sf sidewalk, 770 lf curb, 2,300 sf driveway, plus ancillary works) likely falls between $3.5 M and $4.5 M. The low end assumes minimal ancillary costs; the high end includes comprehensive signal upgrades and fiber‑optic installation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Missouri Department of Transportation·Missouri

Top match · 67%

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Missouri Department of Transportation·Missouri

67% match

SW District, City of Ozark, Construction of two multiuse trail projects

Closes 11/12/2026Opened 10/14/2026

Missouri Department of Transportation·Missouri

67% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Charlotte·North Carolina

66% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Fairfield·Ohio

66% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

City of Cincinnati·Ohio

66% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Nevada Government·Nevada

65% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Kearney·Missouri

64% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

City of Pueblo·Colorado

64% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026

City of Harrisonburg·Virginia

64% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Missouri Department of Transportation·Missouri

64% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

Nevada Government·Nevada

64% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

NYS East Fishkill, Town of·New York

64% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Middletown·Connecticut

64% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Charlotte·North Carolina

64% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Missouri Department of Transportation·Missouri

63% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

Massachusetts City of Springfield·Massachusetts

63% match

27-065: Improvements to Clarendon Street Fountain

Closes 11/18/2026Opened 10/28/2026

City of Charlotte·North Carolina

63% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Goshen, Indiana·Indiana

63% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Missouri Department of Transportation·Missouri

63% match

NW District, City of Bethany, Constructing South Harrison R2 pool sidewalk project

Closes 11/19/2026Opened 10/19/2026

City of Rock Hill·South Carolina

63% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

Greenville Legislative Delegation Transportation Committee·South Carolina

63% match

GLDTC 639 - Roadway Improvements NW Middle School

Closes 12/2/2026Opened 10/22/2026

County of Fairfax·Virginia

63% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Charlotte·North Carolina

63% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

City of Sunnyvale Procurement Bids and RFPs·California

63% match

Lakewood Safe Routes to School

Closes 11/18/2026Opened 10/23/2026