Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Construction
  5. ›Overlay and Chip Hwy 43 East/Chief Joseph Missoula Area

Montana Department of Transportation·Montana

Overlay and Chip Hwy 43 East/Chief Joseph Missoula Area

Closes 4/20/2026$1.5M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Montana Department of Transportation is seeking a qualified contractor to perform an overlay and chip‑seal rehabilitation of approximately four miles of Highway 43 east of Chief Joseph in the Missoula area. The work includes cold‑milling the existing pavement, placing a ½‑in. commercial plant mix overlay, applying chip‑seal (tack coat, chips, reflective tabs), and a fog‑seal finish. Quantities are estimated and the contractor is responsible for all labor, equipment, material supply, traffic control, testing, and disposal of milled material. The contract will be awarded under standard state and MDT terms, with a bid‑security requirement for bids ≥ $150,000 and mandatory registration with the Montana Department of Labor & Industry. • 8,072 tons of ½‑in. commercial plant mix (Grade S PG 58H‑34) to be placed 0.20 ft thick. • 61,013 square yards of cold milling (average depth 0.20 ft) and matching chip‑seal application (≈ 61,013 SY). • Additional items: Type 1 chips, CSS‑1H fog‑seal, liquid emulsified asphalt, test‑trailer transport, mobilization, and traffic‑control services. • Work may not commence until 1 July 2026 and must be completed by 10 June 2027, giving an approximate 11‑month project window.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Richele Parkhurst(Contact)

[email protected]

(406) 546-8243

Key dates

Opened
3/31/2026
Closes
4/20/2026
Duration
11 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
MDT-316431-RP

Budget estimate

$1,500,000 – $2,500,000

The solicitation does not disclose a total contract value. Using the estimated quantities and typical Montana rates for highway work (≈ $150‑$180 per ton of plant mix, $5‑$6 per square yard for cold milling, $1‑$1.20 per square yard for chip‑seal, plus overhead for traffic control and mobilization), the total probable cost ranges between $1.5 million and $2.5 million. Therefore a contractor could expect to earn roughly that amount if awarded the contract, with the actual figure dependent on final quantities, unit‑price bids, and any change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Washington

Top match · 65%

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

U.S. Department Of Transportation·Washington

64% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 8/12/2026

U.S. Department Of Transportation·Idaho

64% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

City of Doge City·Kansas

63% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

63% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026

Idaho Transportation Department·Idaho

63% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Transportation·Mississippi

63% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Illinois Tollway·Illinois

63% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

City of Flowood·Mississippi

63% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

Minnesota Department of Transportation·Minnesota

62% match

260151 SP 2787-31

Closes 11/18/2026Opened 10/21/2026

Montana Department of Transportation·Montana

62% match

Demolition and Removal State-Owned Property - 1016 Kern Street, Missoula

Closes 11/13/2026Opened 10/23/2026

Confederated Tribes of the Colville Reservation·Washington

62% match

San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027

Closes 11/17/2026Opened 10/28/2026

Minnesota Department of Transportation·Minnesota

62% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Kansas Turnpike Authority·Kansas

62% match

KTA 8297 – UBAS Overlay (MM 112‑132)

Closes 11/10/2026Opened 10/14/2026

Lake Havasu City·Arizona

62% match

FY26-27 Chip Seal Program

Closes 11/18/2026Opened 10/21/2026

Tacoma·Washington

61% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

Cherokee Nation Department of Transportation & Infrastructure·Oklahoma

61% match

Bridge 67 over Pecan Creek – CN‑0938‑23BR

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Transportation·Idaho

61% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 11/13/2026Opened 10/13/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

61% match

PUBLIC NOTICE: 2024–2027 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) AMENDMENT NO. 6 APPROVED

Rolling / TBD closeOpened 9/22/2026

Minnesota Department of Transportation·Minnesota

61% match

260133 SP 1115-28

Closes 11/18/2026Opened 10/21/2026