The U.S. Army Corps of Engineers, Southwestern Division (SWD), Tulsa District (SWT) intends to issue a follow-on contract to Cape Fox Expeditionary for Phase 3 at Building 1 at Tinker AFB, Oklahoma. The contract will be issued on a Firm Fixed Price basis and is expected to be performed over 365 calendar days. The work consists of furnishing all Design/Engineering Services, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to provide humidity control and repair the interior administrative areas of Building 1, Tinker AFB, OK.
• The contract is for Phase 3 at Building 1 at Tinker AFB, Oklahoma.
• The work includes Design/Engineering Services, materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals.
• The contract will be issued on a Firm Fixed Price basis.
• The estimated duration is 365 calendar days.
• The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00.